You buy a result; the vendor manages how it gets made.
Changes go through a change request and a new estimate.You decide what to build; INFINIQ runs the team.
HR, payroll, equipment and office by INFINIQ; backlog order by your PO.Engineers work inside your team, on your instructions.
They follow your sprint and code-review rules as written.A Korean or Japanese layer added to any of the three.
The same structure as the Japanese "labo" model, with Korean in place of Japanese.01A team at work under one wall: three ways to run it, one language layer
ODC is a team for one customer; GDC is the center that serves many countries.
One delivery system (same tools, reports and security rules) for customers in several time zones and languages.GDC — global development center
GDC adds the global layer: onshore contact, offshore delivery, and time-zone cover for Seoul, Tokyo, Berlin and Austin from one Hanoi center.
You buy a result; the vendor manages how it gets made.
Best when the result can be written down in advance.
Changes go through a change request and a new estimate.Price risk sits with the vendor; change risk sits with you.→02 · 55Dedicated team (ODC)You decide what to build; INFINIQ runs the team.
The same people stay on your product for years.
HR, payroll, equipment and office by INFINIQ; backlog order by your PO.Knowledge builds up in the team instead of leaving at each project end.→03 · 85Staff augmentationEngineers work inside your team, on your instructions.
The fastest way to add one skill to your team.
They follow your sprint and code-review rules as written.Management stays with you, so your own process sets the pace.→+ · 20–85Korean-speaking dev teamA Korean or Japanese layer added to any of the three.
The same structure as the Japanese "labo" model, with Korean in place of Japanese.→A Korean or Japanese layer added to any of the three.
The same structure as the Japanese "labo" model, with Korean in place of Japanese.
Project-based means fixed price — here is how monthly and hourly differ.
02Kickoff: the stages go up on the flipchart
A signed-off milestone is the trigger for the matching payment.
Scope, total and milestones written into the contract.
The vendor carries more of the price risk; changes go through change requests.
Claims app for a Seoul insurer: 16 weeks, 3 milestones (example)Team size × monthly rate; scope moves through the backlog.
The default for a dedicated team (ODC).
Same app as a 4-person team over 4 months (example)Paid for the hours actually worked (time & materials).
Suits small fixes and research spikes; the total is hard to predict.
A 40-hour performance check before launch (example)A screen list and a feature spec fix the scope.
Every requirement gets an ID that is traced to its test cases.Work is cut into packages of 8 to 80 hours.
The 8/80 rule of thumb: no package under 8 h or over 80 h.Design 4 weeks · build 8 weeks · acceptance 2 weeks (example).
A signed-off milestone is the trigger for the matching payment.You test against the acceptance sheet.
Accepted with 0 critical and at most 2 major defects (example).A free defect-fix period follows acceptance.
3 months of free fixes; new features are quoted separately (example).A request outside the scope goes back to the first column as its own card.
(KR) 소프트웨어 진흥법: public software projects review task changes in a task review committee.Seats and roles, cost, ramp-up and how knowledge is kept.
One customer's team sits in one area.
03After the stand-up: a short talk in the team area
03Morning stand-up at the team board
Fifteen minutes each morning: done, next, blocked.
(INT) Scrum Guide 2020: the Daily Scrum is 15 minutes; a sprint is one month or less.Your PO sets the order of the work.
Two sprints of work are kept ready at all times (example).One customer's team sits in one area.
Area entry logged by badge; no screen sharing with other customers' teams (example).Each role's monthly rate times its people; seat, equipment and management included (example).
Part-time seats such as a designer are billed by FTE, e.g. 0.5.Desks, laptops and accounts first, people next.
Starting with one or two people and growing is the order lab-type vendors recommend.Every key role has a named backup.
Backups join the weekly review so knowledge is never with one person only (example).Decision records and runbooks sit in your wiki.
(VN) Labor Code 2019 Art. 35: 45 days' notice on open-ended contracts — the handover runs in that window.INFINIQ offers BOT (build → operate → transfer): the team can later move into your own company.
Transfer bars (team size, quality) go into the first contract; employment contracts, IT systems and accounts move together.You choose and manage the engineers; INFINIQ employs and equips them.
04The new engineer at the customer team's board
Your engineers run the technical interview.
Candidates are short-listed against your skill matrix.
It starts from a one-page request with must-have and nice-to-have skills.Your engineers run the technical interview.
60-minute video interview with live coding (example).Start date, FTE and working hours are fixed.
With Austin, one fixed hour in the Hanoi evening becomes the daily touchpoint (example).Your accounts, tools and review rules.
Week-one goal: a working dev environment and one small fix merged (example).Stack, level, domain and language checked against the request.
Levels 1–4 per skill; at least level 3 on every must-have (example).Your engineer has interviewed and said yes.
The interview record is kept with the SOW.A personal NDA on top of the company one.
Kept with the SOW and reviewed again every year (example).Your accounts, issued by you, with multi-factor sign-in.
Only the repositories and environments the tickets need (least privilege).A small, real task in the first week.
Merged by day 5 (example).Agreed before day one, not after a problem.
Ask within 30 days; a new candidate within 2 weeks; no extra fee for the switch (example).A layer on any of the three: a bridge engineer links two languages.
A bridge SE closes the gaps in language, culture and business practice between the client and the offshore team.— Summary of doda (JP), "What is a bridge SE"
Show the refund button only for 7 days after payment.
Chỉ hiển thị nút hoàn tiền trong vòng 7 ngày sau khi thanh toán.
Tính 7 ngày theo giờ Seoul hay giờ Hà Nội?
Should the 7 days follow Seoul time or Hanoi time?
Seoul time (KST), please.
Seoul 09:00 is Hanoi 07:00.
Seoul 18:00 is Hanoi 16:00; the team's last two hours go to wrap-up and questions (example).Soft wording is turned into a clear decision.
JP A Japanese 「検討します」 ("we will consider it") is confirmed in the minutes as yes, no or later.Every translated spec carries a "why" line.
A Japanese spec reaches the team as a Vietnamese version with intent notes added.Customer in Korean, team in Vietnamese, code and tickets in English.
The bridge manager can run meetings in EN · VI · JA · KO.The bar is set with public language tests.
TOPIK level 5+ for Korean, JLPT N2+ for Japanese (example).A weekly report in your language.
Four headings: done, not done, risks, next week (example).05A weekly sync on the bridge engineer's laptop
Time-zone cover, reporting rhythm, security controls and data laws.
Your data stays in your environment.
Seoul and Tokyo share 7 hours; Berlin 3–4; New York and Austin one fixed evening call.
Europe and the US change clocks twice a year, so the call schedule is reissued each spring and autumn.Weekly report on Friday, monthly steering, SLA check.
Steering looks at KPI trends, team changes and the next quarter's plan (example).An NDA on day one and security training every year.
A personal NDA on top of the company one, checked again every year (example).Badge entry, clean desks, a visitor log.
Area entry logged by badge; no screen sharing with other customers' teams (example).VPN, multi-factor sign-in, encrypted disks.
Repositories and cloud accounts are used only through accounts you issue.Your data stays in your environment.
Least privilege, with access reviewed each quarter (example).Seven steps to the first sprint, then the team grows (example).
07Day one: the laptop is ready before the first stand-up
Team cost is shown role by role with FTE, not as one lump sum.
Send the goal by the contact form or email.
One workshop on goals, systems and constraints.
Team, model, schedule and the first two sprints' goals.
CVs for the first three roles; you interview.
NDA, MSA and the first SOW.
Team charter, accounts and meeting slots.
Demo and written report at the end of the sprint.
01A specialist replies within one business day, in English, Vietnamese, Japanese or Korean.
02An NDA is signed first so the repository can be opened.
03Team cost is shown role by role with FTE, not as one lump sum.
04Interviews are set within 2–5 days of the CVs (example).
05Later growth needs only a new SOW under the same MSA.
06The team charter lists roles, overlap hours, tools and the escalation path.
07Every two weeks after that, the same demo and report.
+Team size steps of a Tokyo customer's dedicated team (example).
Start small, then draw on build, test, data and NFFICE (example).
One app or an MVP.
Web, app and API for one product.
Several products, or a platform with many integrations.
Any of the nine development areas can run as a project or a dedicated team.
Developers write and run automated tests in every build.Development Biz →A dedicated QA team can sit next to the dedicated dev team.
For independent verification, QA Biz tests separately and reports to you directly.QA Biz operating model →Training and evaluation data for the AI features the team builds.
A separate SOW under the same MSA keeps data work and development billed apart (example).AI Data Biz →Customization and integration of NFFICE for your company.
e.g. linking NFFICE multilingual approvals to an ERP that a Seoul head office already runs (example).NFFICE customization →08One floor, four business units side by side
Yes. In a dedicated team each member is assigned to your product alone; part-time roles such as a designer at 0.5 FTE are written into the SOW.
It is each role's monthly rate times its FTE. What else is included — equipment, office, licences — is listed in the SOW.
Yes. You receive CVs for each role and run the interviews with your own engineers before anyone joins.
(VN) Labor Code 2019 gives a notice period — 45 days on open-ended contracts — and the handover and the replacement run inside it. Key roles also have a named backup.
Often two: one developer and a PM who also bridges; more people join as the backlog grows (example).
Yes. INFINIQ offers BOT (build → operate → transfer). The transfer bars and timing are written into the first contract; at transfer, employment contracts, IT systems and accounts move together.
Yes. QA Biz can run a dedicated QA team next to your developers and also test independently, reporting to you directly.
Yes. The bridge manager runs meetings in English, Vietnamese, Japanese or Korean; for Japanese customers the team works in Japanese.
A demo and a written report every two-week sprint, plus access to the backlog and the repository at any time.
Within one business day — in English, Vietnamese, Japanese or Korean.