EN·VI·KO·JA Contact
Solutions / Packages
[ Solutions · Packages ]

Products combined for the job.

Five packages built from INFINIQ products
— each one answers a problem we meet again and again in Vietnam.

The brochure

One spread per package.

The problem on the left page, the answer on the right: what is inside, and three editions from a first site to a group of sites.

“Cards are swapped at the gate and overtime is argued at month-end.”

p. 02
Package

Smart Attendance

A live face at the gate becomes the attendance record — shifts, night hours and overtime are worked out against Vietnamese limits, and payroll closes from one clean set of hours.

Inside
  • IQ FaceAt the gate
  • NFFICE HRBehind the gate
  • NFFICE GroupwareApprovals
Editions
  • Basic One site, one shift pattern — replace cards and paper sheets
  • Standard Factories with shifts, night work and overtime pay
  • Plus Several gates or sites, contractor crews, HQ reporting

“Nobody can say who is on site, or where heat is building, until it is too late.”

p. 04
Package

Site Safety

Know who is on site and in which zone, see unsafe acts as they happen, and catch heat before smoke — with every alert and action on one safety record.

Inside
  • IQ FaceFace recognition · who is on site
  • IQ GuardianVision AI · unsafe acts
  • IQ FireThermal AI · heat before smoke
Editions
  • Essential Small sites, or a first phase on one block
  • Standard Most construction and industrial sites
  • Plus Large, multi-block or multi-site operators

“Defects reach the customer and the cause takes days to find.”

p. 06
Package

Smart Quality

Every part inspected, every hot machine watched, and every defect traced to the machine, shift and lot behind it — the same day.

Inside
  • QC AutomationInline inspection
  • IQ FireMachine heat
  • AI OntologyCause links
Editions
  • Inspect One line where escapes or manual inspection cost the most
  • Trace Plants supplying IATF 16949 or demanding OEM customers
  • Prevent Several lines or plants, with MES and customer reporting

“Headquarters waits for an English report built by hand from Vietnamese books.”

p. 08
Package

HQ Reporting

Run the entity in Vietnamese, report to HQ in English — both from the same approved records.

Inside
  • NFFICE GroupwareApprovals & documents
  • NFFICE FinanceBooks, currencies & e-invoices
  • AI OntologyEnglish report & Q&A
Editions
  • Basic One entity that needs bilingual approvals and a clean monthly pack
  • Standard Entities whose HQ wants daily visibility in English
  • Plus Groups with several Vietnamese entities or plants

“Visitors sign a paper book and walk where they like once inside.”

p. 10
Package

Visitor & Security

Every visitor is invited, approved and recognised at the gate — and if they step where they should not, security sees it with a snapshot.

Inside
  • IQ FaceVisitor entry by face
  • IQ GuardianRestricted zones on CCTV
Editions
  • Basic Offices and small plants that want a clean visitor log
  • Standard Plants with production lines, server rooms or R&D areas
  • Plus Campuses, several sites, daily contractor crews
Index

Look up the symptom, turn to the package.

Problems we hear on site visits, in index order. The numbers are the packages that answer them; the tabs on the right open each one.

8

8D report takes a week03

A

Approvals waiting for a wet signature01, 04
Attendance fixed by hand at cut-off01

B

Buddy punching at the gate01

C

Contractor crews counted on paper01, 02, 05

D

Defects found by the customer03

E

Exchange rates applied differently each month04

F

Face data kept with no retention rule01, 05

H

HQ asking for figures every day04
Headcount unknown in an evacuation02, 05
Helmets and harnesses not worn02
Hot work without a fire watch02

I

ID cards held at the guard post05

K

English report rebuilt by hand04

M

Motors overheating before failure03

N

Night hours split by hand01

O

OEM asks for lot traceability03
Overtime past 40 h a month noticed too late01

P

Panels found hot only after smoke02, 03
Paper visitor book05
Purchase e-invoices matched by hand04

R

Restricted rooms with no alert02, 05

V

VAS books and HQ accounts do not match04
Visitors walking into production05
Glossary

Twenty measures you will be able to see.

Four per package, defined before installation so the parallel run compares like with like.

01Smart Attendance02Site Safety03Smart Quality04HQ Reporting05Visitor & Security
ACRAttendance capture rate

Person-days with both an in and an out from the gate ÷ scheduled person-days, per month in NFFICE HR.

PPEPPE compliance

Person detections wearing the gear required in that zone ÷ all person detections in zones with PPE rules, per shift.

FPYFirst-pass yield

Parts passed at first inspection ÷ parts inspected, per line and shift; from inspection-cell results.

CLDClose days

Working days from the last day of the month to the director’s approval of the HQ pack — read from the approval timestamp.

PRRPre-registration rate

Visits pre-registered and approved ÷ all visits, per month (from the visit log).

EXRException rate

Attendance records corrected by hand ÷ all attendance records in the period.

ACKTime to acknowledge

Median minutes from an alert being sent to the zone owner acknowledging it in the app, per week.

PPMCustomer PPM

Defective parts reported by the customer ÷ parts shipped × 1,000,000, per month.

APTApproval lead time

Sum of (final approval time − submission time) ÷ number of documents approved in the month, by form type.

OVSOverstay rate

Visits still open 30 min after the time window ÷ all visits.

OTWOvertime-cap warnings

Employees above 80 % of the monthly overtime cap ÷ employees with any overtime, per month.

MUSMuster time

Minutes from the alarm until every person on the muster list is accounted for, per drill.

FRRFalse reject rate

Camera rejects found good on re-check ÷ parts inspected; tracked to tune limits.

EIME-invoice match rate

Purchase e-invoices matched to an approved request or order ÷ purchase e-invoices received in the month.

ZRTZone alert response

Median minutes from IQ Guardian alert to guard acknowledgement in the app.

CLDClose lead time

Working days from the cut-off date to payroll-ready hours, counted from the NFFICE HR period lock.

HEATHeat warnings closed

Warnings closed with a work order and a normal-temperature check ÷ warnings raised, per month.

TTCTime to cause

Hours from the first alarm to the root cause confirmed in the 8D (D4); from the NFFICE record.

RCNLedger reconciliation

Mapped accounts where the VND legal books and the USD HQ view agree after translation ÷ all mapped accounts, at close.

MLAMuster list accuracy

Visitors accounted for at the muster point ÷ visitors on the list, per drill.

Definitions only — values are measured on your site.

Timing

How long each one takes, side by side.

Typical single-site plans, in weeks from the signed survey. The cursor runs the calendar; bars fill as each phase completes. Attendance and HQ Reporting go live on the first clean payroll cut-off or month-end close.

Week
01234567891011
01Smart Attendance
Site survey
Rules & consent
Install & enrol
Parallel payroll cycle
Live Next cut-off
02Site Safety
Site survey
Design
Install
Tune and pilot
Live Week 8
03Smart Quality
Line and site survey
Samples and design
Install
Shadow run
Live Week 10
04HQ Reporting
Rules and accounts
Groupware
Finance and integrations
English report
Parallel close and go-live Next month-end
05Visitor & Security
Survey
Rules
Install
Pilot
Go-live Week 4
Start small

A pilot that runs one full cycle, then grows.

Every package has a smallest useful scope — big enough to close one real cycle, small enough to install in weeks. The same set-up then grows by site size and tier.

LargeMediumSmallPilot
Start with

One gate, one shift group, one payroll cycle

Then grow to
  1. Smallup to 300 people, 1 gate
  2. Medium300–1,500 people, 2–3 gates
  3. Large1,500+ people, several gates or sites
Basic→Standard→Plus
Open the package→
LargeMediumSmallPilot
Start with

One block, its gates and one muster point

Then grow to
  1. Smallup to 150 people · 1–2 gates
  2. Medium150–600 people · 2–4 gates
  3. Large600+ people · several blocks or sites
Essential→Standard→Plus
Open the package→
LargeMediumSmallPilot
Start with

One line, at the inspection point with the most escapes

Then grow to
  1. Small1 line, 1–2 inspection points
  2. Medium2–4 lines, one plant
  3. Large5+ lines or several plants
Inspect→Trace→Prevent
Open the package→
LargeMediumSmallPilot
Start with

One entity, one monthly HQ pack

Then grow to
  1. Smallone entity, up to 100 users
  2. Mediumone entity with plants or branches, 100–500 users
  3. Largeseveral Vietnamese entities, 500+ users
Basic→Standard→Plus
Open the package→
LargeMediumSmallPilot
Start with

One lobby gate, invited visitors only

Then grow to
  1. Small1 gate · up to 30 visitors a day
  2. Medium2–3 gates · 30–150 visitors a day
  3. Largecampus or several sites · 150+ visitors and contractors a day
Basic→Standard→Plus
Open the package→
Rules

Why these five — the rules behind them.

40 hovertime a month · 200 h a year, 300 h in listed sectors

Smart Attendance

Vietnamese law caps overtime at 40 hours a month and 200 a year, 300 in listed sectors such as garments, footwear and electronics. Night work runs from 22:00 to 06:00 and is paid at least 30 % more. The package counts both from the gate, not from a request form.

  • (VN) Labour Code 45/2019/QH14, Art. 107; Decree 145/2020/ND-CP
  • (VN) Labour Code 45/2019/QH14, Art. 98 & 106
Same topic elsewhere
  • KR Labor Standards Act Art. 53 — 12 h a week
  • JP Labour Standards Act Art. 36 — 45 h a month, 360 h a year
  • EU Working Time Directive 2003/88/EC — 48 h a week
  • US FLSA — 1.5× past 40 h a week
1× a yearfire drill at the least · protective equipment supervised

Site Safety

The employer provides suitable protective equipment and supervises its use; the head of a site sets rules for electricity and heat sources and drills the fire plan at least once a year. Cameras and thermal sensors keep the evidence on one record.

  • (VN) Law on Occupational Safety and Hygiene 84/2015/QH13, Art. 16, 17, 23
  • (VN) Law on Fire Prevention, Fighting and Rescue 55/2024/QH15; Decree 105/2025/ND-CP
Same topic elsewhere
  • KR Occupational Safety and Health Act
  • JP Industrial Safety and Health Act
  • EU Framework Directive 89/391/EEC
  • US OSH Act 1970
2026quality management system required of producers

Smart Quality

From 2026 producers must run a quality management system and stop, notify and remedy when nonconforming goods are found; automotive customers add lot traceability and structured problem solving. Inspection, heat and cause records answer both.

  • (VN) Law on Product and Goods Quality 05/2007/QH12, amended by Law 78/2025/QH15
  • (VN) TCVN ISO 9001:2015; IATF 16949 where customers require it
Same topic elsewhere
  • KR Framework Act on Product Safety
  • JP Product Liability Act
  • EU General Product Safety Regulation (EU) 2023/988
  • US Consumer Product Safety Act
VNDbooks in Vietnamese and dong · new chart of accounts from 2026

HQ Reporting

Books are kept in Vietnamese and in VND, with a new chart of accounts for fiscal years from 1 January 2026. Headquarters reads English and USD — the package keeps one approved record and two views of it.

  • (VN) Law on Accounting 88/2015/QH13
  • (VN) Circular 99/2025/TT-BTC, replacing Circular 200
Same topic elsewhere
  • KR Act on External Audit (K-IFRS)
  • JP Companies Act; Financial Instruments and Exchange Act
  • EU Accounting Directive 2013/34/EU
  • US SEC Regulation S-X (US GAAP)
Consentexplicit, for face data · ID cards may not be held

Visitor & Security

A face is biometric, sensitive personal data: consent must be explicit and kept only as long as the purpose needs. Holding a visitor’s ID card as a pledge is prohibited. Invitations and face entry replace both the paper book and the card in the drawer.

  • (VN) Law on Personal Data Protection 91/2025/QH15; Decree 356/2025/ND-CP
  • (VN) Law on Identification 26/2023/QH15, Art. 7
Same topic elsewhere
  • KR PIPA Art. 23 — sensitive data
  • JP APPI — personal identification codes
  • EU GDPR Art. 9
  • US Illinois BIPA
Reply card

Tick what applies — it tells us where to start.

The first question from each package page, on one card. Bring it to the site survey; the ticks decide the first package and its size.

INFINIQ Vietnam · Hà NộiReplySample card
  1. ✓Do you run night shifts or more than one shift?→ 01 Smart Attendance
  2. ✓Do you need heat watched on panels, storage or hot work?→ 02 Site Safety
  3. ✓Is the main pain defects reaching the customer from one or two lines?→ 03 Smart Quality
  4. ✓Do you report to HQ from more than one Vietnamese entity?→ 04 HQ Reporting
  5. ✓Do visitors go past the lobby into production, storage or IT areas?→ 05 Visitor & Security
People on siteUnder 300 people300–1,5001,500+Several sites
Training languageTiếng Việt한국어English
FAQ

Questions we hear often

Can we start with one product and add the rest?

Yes. Every package is built from products that work alone; start where the pain is and add the next part on the same accounts.

Can two packages share devices?

Yes — a face terminal or thermal camera installed for one package is reused by the next.

Cloud or on-premise?

Either. Packages with face data or video are often installed on your servers; NFFICE can run in the cloud.

Who supports it after go-live?

INFINIQ Vietnam in Hanoi — in Vietnamese, Korean and English, on site when needed.

How do we pick the right package?

Start from the problem you hear most on site: the index on this page sends each symptom to a package, and the reply card gathers the first question of each. In the site survey, your answers set the first package and its size.

What is the difference between the three tiers?

The products stay the same; the scope grows. The first tier covers one site or one simple case, the second adds the rules most sites need, and the third adds more gates, sites, contractors and HQ reporting.

How long until a package goes live?

For one site, counted from the confirmed survey: about four weeks for Visitor Security, eight for Site Safety and ten for Smart Quality. Smart Attendance and HQ Reporting go live at the first clean payroll or month-end close.

What does a pilot cover?

The smallest scope that closes one real cycle: one gate, one shift and one payroll for attendance; one block for safety; one line for quality; one entity and one monthly report for HQ; one lobby gate for visitors. The same set-up then grows with site size.

How do we measure whether it worked?

Each package has four indicators, defined before installation so the parallel run compares like with like — for example the attendance auto-record rate or customer PPM. This page gives the definitions; the values are measured on your site.

What does a quote include?

Equipment where the package needs it (terminals, cameras, servers), the licences, and the survey, installation and training. Quantities come from the site survey: gates, lines, cameras, users and sites.

Not sure which one?
Ask us.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top