Not a market overview — the products we put in, where they go, and what they hand back.
On one site, INFINIQ does five jobs: we supply the products, install and connect them, make the data they learn from, test them, and keep them running.
This page draws each industry as a site plan. Every number on a plan is a zone; for each one we wrote the problem there, the INFINIQ product or service that goes in, and the record it leaves behind.
We put vision AI on the gates and cameras you already have, and turn each site event into an approval and a report for HQ.
We inspect every part, watch machines for heat, count shifts at the gate — and link each problem to the machine, shift and lot behind it.
We run the entity's daily work — approvals, people, sales and money — in each person's language, and connect it to HQ.
For facility operators and integrators: video AI and thermal detection on existing cameras, the data to train city AI, and testing before go-live.
We do not build the machine. We make the data it learns from and test that it behaves — from the test track to the release.
Choose an industry and a site problem: the stack by role, the package and the first step come with it.
Example site: a Korean contractor's plant build in Da Nang, 14 subcontractors on one gate.
Our role hereWe put vision AI on the gates and cameras you already have, and turn each site event into an approval and a report for HQ.
Industry page · Construction →Example site: a Japanese-owned components plant in Hai Phong, three shifts, two assembly lines.
Our role hereWe inspect every part, watch machines for heat, count shifts at the gate — and link each problem to the machine, shift and lot behind it.
Industry page · Manufacturing →Example: a US-owned distributor in Ho Chi Minh City reporting to its parent in Chicago.
Our role hereWe run the entity's daily work — approvals, people, sales and money — in each person's language, and connect it to HQ.
Industry page · Local & FDI →Example: a transit operator's interchange station and its control room; a partner integrator holds the city contract.
Our role hereFor facility operators and integrators: video AI and thermal detection on existing cameras, the data to train city AI, and testing before go-live.
Industry page · Smart city →Example: an autonomous-shuttle team in Munich and a warehouse-robot maker in Osaka, both sending data to INFINIQ.
Our role hereWe do not build the machine. We make the data it learns from and test that it behaves — from the test track to the release.
Industry page · Mobility & robotics →Crews and day workers change daily; paper sign-in allows proxy check-ins and no one knows who is on site now.
Entry log with snapshot · attendance per subcontractor · live headcount and muster list
Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).
Missing helmets and harnesses, people inside the crane swing or the excavation edge — too many cameras, too few eyes.
PPE or intrusion event with snapshot, pushed to the zone's site manager
Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).
Welding sparks near formwork and fuel; heat builds after the shift, when few people are watching.
Staged thermal alarm to the on-call lead · event log with time and place
Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).
Permits, checklists and delivery notes stay on paper; corrective actions get lost in chat.
Corrective action approved and tracked · paper forms as data · cost per site
Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).
HQ wants a daily safety picture in its own language, not hours of footage.
Daily safety report in English for the parent company · repeat patterns by zone, hour and subcontractor
Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).
Three shifts, night work and overtime are reconciled by hand at month-end.
Shift attendance, overtime against the legal cap, payroll-ready data
QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).
Visual inspection is sampled and tiring; defects are written down and seen too late.
Pass / fail per part, defect image by type, yield per line and shift
QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).
Overheating panels, motors and bearings look normal until there is smoke.
Staged heat alarm with thermal snapshot · repair work order in NFFICE
QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).
Forklift lanes, robot cells and restricted stores are entered without permission; visitors wander.
Intrusion and PPE events per zone · visitor entry and exit log
QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).
Machine, quality and maintenance data sit in different systems, so the root cause takes days.
Likely cause (same machine, shift, lot) · maintenance request approved · lot trace report
QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).
Controllers and devices need software built and validated by a team that can stay on it.
Device software and integration · test report per release
QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).
Staff, visitors and auditors come in with paper sign-in and shared badges.
Entry log by person · pre-registered visitors with host notice
NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.
Vietnamese drafts wait for managers who read another language; HQ approval rules are not followed.
Approved document with original and translation kept together, under HQ approval rules
NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.
Vietnamese leave, holiday and overtime rules; work permits for expatriate staff.
Rules per entity · monthly close · permit and visa expiry alerts
NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.
Multi-currency expenses, Vietnamese e-invoices and re-typing into the accounting system.
Pending voucher in accounting · invoices read into data · amounts shown in the HQ currency
NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.
Korean and Vietnamese sales staff keep separate lists; tax codes and invoices are checked by hand.
One pipeline from lead to tax invoice · tax-code check on every account
NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.
HQ ERP and local tools do not talk; a launch in Vietnamese shows broken text and dates.
Connectors to HQ systems · a dedicated team that works in your language · localization test report
NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.
HQ wants this month's status in its own language, with the numbers behind it.
Monthly report in English for the US parent · questions answered with sources
NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.
Control rooms, plant rooms and staff areas are opened with shared cards.
Face-based access log per door
Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).
Crowding, loitering, falls and intrusion across hundreds of feeds.
Event cards with snapshot instead of watching every feed
Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).
Panels and EV chargers overheat out of sight, often at night.
Early heat alarm with location
Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).
Events from different systems arrive on different screens; actions are not recorded.
One event timeline · events sent to the existing VMS or operations centre · action report
Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).
Faces and plates are personal data; city AI lacks local training data.
Masked footage before storage or sharing · labelled video datasets
Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).
A city system must hold under load and be checked for vulnerabilities before it opens.
Load and vulnerability test report
Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).
Driving and grasping data is costly to collect and rarely covers the hard cases.
Collected and cleaned sessions: video, LiDAR, teleoperation demos
A paid pilot: 500 labelled samples or one test cycle.
Precise 3D boxes, tracks and grasp points in large volumes.
Labelled frames and sequences in the customer's format
A paid pilot: 500 labelled samples or one test cycle.
Driving video holds faces and number plates.
Masked data and a processing record
A paid pilot: 500 labelled samples or one test cycle.
Label errors reach training and are found only when the model fails.
Inspection report per lot before delivery
A paid pilot: 500 labelled samples or one test cycle.
Models must run light on the vehicle or robot.
Compressed model for the device
A paid pilot: 500 labelled samples or one test cycle.
Function and safety scenarios must be proven before release.
Scenario test report
A paid pilot: 500 labelled samples or one test cycle.
Battery storage and charging bays can overheat unseen.
Heat alarm for battery areas (proposal)
A paid pilot: 500 labelled samples or one test cycle.
For each zone: the problem, the product or service, and the record it produces.
IQ Guardian, IQ Fire, IQ Face and NFFICE, bundled as Site Safety.
Survey of existing CCTV, gates and network; install; entries linked to NFFICE HR; site forms in Groupware.
Proposal: PPE rules tuned on the site's own footage, labelled by AI Data Biz.
Zones and rules updated as the site moves from foundation to frame to finishing; local support.
Crews and day workers change daily; paper sign-in allows proxy check-ins and no one knows who is on site now.
Entry log with snapshot · attendance per subcontractor · live headcount and muster list
Missing helmets and harnesses, people inside the crane swing or the excavation edge — too many cameras, too few eyes.
PPE or intrusion event with snapshot, pushed to the zone's site manager
Welding sparks near formwork and fuel; heat builds after the shift, when few people are watching.
Staged thermal alarm to the on-call lead · event log with time and place
Permits, checklists and delivery notes stay on paper; corrective actions get lost in chat.
Corrective action approved and tracked · paper forms as data · cost per site
HQ wants a daily safety picture in its own language, not hours of footage.
Daily safety report in English for the parent company · repeat patterns by zone, hour and subcontractor
The dashed line is the record’s path; the lit zone and its card move together. Hover a card or a number to hold one.
QC Automation, IQ Fire, IQ Guardian, IQ Face, NFFICE — Smart Quality and Smart Attendance.
Camera and lighting at the inspection point; links to MES, ERP and payroll; embedded and IoT work.
Good and defective part images labelled so the inspection model learns your products.
Device and embedded software validation.
Models retrained when products or lines change; monthly review.
Three shifts, night work and overtime are reconciled by hand at month-end.
Shift attendance, overtime against the legal cap, payroll-ready data
Visual inspection is sampled and tiring; defects are written down and seen too late.
Pass / fail per part, defect image by type, yield per line and shift
Overheating panels, motors and bearings look normal until there is smoke.
Staged heat alarm with thermal snapshot · repair work order in NFFICE
Forklift lanes, robot cells and restricted stores are entered without permission; visitors wander.
Intrusion and PPE events per zone · visitor entry and exit log
Machine, quality and maintenance data sit in different systems, so the root cause takes days.
Likely cause (same machine, shift, lot) · maintenance request approved · lot trace report
Controllers and devices need software built and validated by a team that can stay on it.
Device software and integration · test report per release
The dashed line is the record’s path; the lit zone and its card move together. Hover a card or a number to hold one.
NFFICE Groupware, HR, CRM and Finance; OCR Editor; HQ Reporting.
Approval lines from HQ regulations, document migration, HQ ERP connectors, a dedicated team (ODC).
Localization testing of screens, translation, dates and currency.
Rules updated for new entities and law changes; support in English, Vietnamese, Japanese and Korean.
Staff, visitors and auditors come in with paper sign-in and shared badges.
Entry log by person · pre-registered visitors with host notice
Vietnamese drafts wait for managers who read another language; HQ approval rules are not followed.
Approved document with original and translation kept together, under HQ approval rules
Vietnamese leave, holiday and overtime rules; work permits for expatriate staff.
Rules per entity · monthly close · permit and visa expiry alerts
Multi-currency expenses, Vietnamese e-invoices and re-typing into the accounting system.
Pending voucher in accounting · invoices read into data · amounts shown in the HQ currency
Korean and Vietnamese sales staff keep separate lists; tax codes and invoices are checked by hand.
One pipeline from lead to tax invoice · tax-code check on every account
HQ ERP and local tools do not talk; a launch in Vietnamese shows broken text and dates.
Connectors to HQ systems · a dedicated team that works in your language · localization test report
HQ wants this month's status in its own language, with the numbers behind it.
Monthly report in English for the US parent · questions answered with sources
The dashed line is the record’s path; the lit zone and its card move together. Hover a card or a number to hold one.
IQ Guardian, IQ Fire and IQ Face on the operator's existing cameras.
Integration with the existing VMS or operations centre, directly or as a partner to the prime integrator.
Video datasets and masking for city AI.
Performance, load and security testing before go-live.
Rules per place and hour; monitoring and local support.
Control rooms, plant rooms and staff areas are opened with shared cards.
Face-based access log per door
Crowding, loitering, falls and intrusion across hundreds of feeds.
Event cards with snapshot instead of watching every feed
Panels and EV chargers overheat out of sight, often at night.
Early heat alarm with location
Events from different systems arrive on different screens; actions are not recorded.
One event timeline · events sent to the existing VMS or operations centre · action report
Faces and plates are personal data; city AI lacks local training data.
Masked footage before storage or sharing · labelled video datasets
A city system must hold under load and be checked for vulnerabilities before it opens.
Load and vulnerability test report
The dashed line is the record’s path; the lit zone and its card move together. Hover a card or a number to hold one.
Collection, 3D and physical-AI labelling, masking and data QA — the core of the work here.
Function and safety scenario validation; AI model evaluation.
Edge AI and model compression; embedded software.
A steady labelling team per programme, scaled up or down by batch.
Driving and grasping data is costly to collect and rarely covers the hard cases.
Collected and cleaned sessions: video, LiDAR, teleoperation demos
Precise 3D boxes, tracks and grasp points in large volumes.
Labelled frames and sequences in the customer's format
Driving video holds faces and number plates.
Masked data and a processing record
Label errors reach training and are found only when the model fails.
Inspection report per lot before delivery
Models must run light on the vehicle or robot.
Compressed model for the device
Function and safety scenarios must be proven before release.
Scenario test report
Battery storage and charging bays can overheat unseen.
Heat alarm for battery areas (proposal)
The dashed line is the record’s path; the lit zone and its card move together. Hover a card or a number to hold one.
Combinations we see often — start with one product and add the rest later.
Entry at the gate becomes attendance, overtime and payroll data.
People, behaviour and heat on one safety screen.
Defects and heat traced to machine, shift and lot.
Bilingual approvals, multi-currency expenses, a report HQ reads in its own language.
Pre-registered visitors enter by face; restricted zones watched in real time.
Collection, labelling, data QA and scenario validation under one contract and one project lead.
Small and measurable first; the same steps in every industry.
Walk the site; check cameras, gates, networks, systems and data; agree the targets.
One gate, line, site, entity or data batch; tuned on your own footage, documents or data.
More sites and entities; NFFICE workflows, integrations and HQ reports switched on; testing before go-live.
Monitoring, rule and model updates as sites change, monthly review, support in three languages.
A site survey of one project: the gate, two or three high-risk zones and the cameras already there.
Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).
Pick one inspection point or one gate. We look at the line, lighting and sample parts, or at the shift rules.
QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).
A workshop on HQ approval rules and the forms the entity uses most.
NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.
One facility — a station, a public building or a park — with the cameras it already has.
Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).
A call on sensors, formats and the label guide; a sample of the customer's data.
A paid pilot: 500 labelled samples or one test cycle.
Each page goes deeper: challenges, solutions and a day with INFINIQ.
We put vision AI on the gates and cameras you already have, and turn each site event into an approval and a report for HQ.
We inspect every part, watch machines for heat, count shifts at the gate — and link each problem to the machine, shift and lot behind it.
We run the entity's daily work — approvals, people, sales and money — in each person's language, and connect it to HQ.
For facility operators and integrators: video AI and thermal detection on existing cameras, the data to train city AI, and testing before go-live.
We do not build the machine. We make the data it learns from and test that it behaves — from the test track to the release.
Tell us the site and the problem — we start with a survey and a small pilot.
Both, on purpose. We build the products (NFFICE, the IQ series, QC Automation, OCR Editor) and also survey, install and connect them. On large public projects we can join as a partner to the prime integrator.
Usually not. Existing cameras and turnstiles are checked in the site survey and reused where they can be; Development Biz connects to the ERP, HR or VMS you already run.
Yes. Each product works on its own. Packages are combinations we see often; you can start with one and add the rest later.
Your team runs the site; we monitor, update rules and models when the site changes, and support you locally in English, Vietnamese, Japanese and Korean.
No. In mobility and robotics we make the training data and validate behaviour; the machine and its model stay yours.
On your servers or in a dedicated cloud — agreed in the security review. Only events and reports need to leave the site, and personal data can be masked first.
Yes — for example QC Automation with defect labelling from AI Data Biz and MES integration from Development Biz, under one project lead.
A site survey, then a pilot on one gate, line, site or entity — or, for data and testing, 500 labelled samples or one test cycle.
As an example, a survey takes one to two weeks, a pilot four to eight weeks and the rollout to more sites and entities two to six months. Operation then continues with monthly reviews.
Yes. AI Data Biz de-identifies footage before it is stored or shared and keeps a processing record, under rules such as the PDPL 91/2025/QH15 (VN), PIPA (KR), APPI (JP) or GDPR (EU). On smart city pilots the masking rules are agreed before the first camera group goes live.