EN·VI·KO·JA Contact
Construction & Industry
01 / 05 · Cranes · gates · daily reports Construction & Industry Crane radius, edges and hot work watched zone by zone; crews and day workers counted at the gate. View details ↗
Manufacturing
02 / 05 · Shifts · safety · equipment Manufacturing Three shifts, one safety and time record — with thermal checks, machine signals and work orders. View details ↗
Local & foreign-invested companies
03 / 05 · Home-country HQ · Vietnamese entity Local & foreign-invested companies Hours, leave and pay by Vietnamese law — linked to HQ sign-on, ERP and e-invoices. View details ↗
Smart city
04 / 05 · Control rooms · roads · tunnels Smart city Only the scenes that matter from thousands of cameras — stopped cars, wrong-way drivers and smoke at night. View details ↗
Mobility & robotics
05 / 05 · Driving data · robot episodes · validation Mobility & robotics Test drives become labeled scenarios; robot-arm demos become training episodes. View details ↗
Home / Industries
[ Industries ]

Built for the sitesVietnam runs on.

Each industry page starts with the problem on the ground, then the products and services that solve it.

Scroll to explore ↓
Our role

What INFINIQ does on each site

Not a market overview — the products we put in, where they go, and what they hand back.

On one site, INFINIQ does five jobs: we supply the products, install and connect them, make the data they learn from, test them, and keep them running.

This page draws each industry as a site plan. Every number on a plan is a zone; for each one we wrote the problem there, the INFINIQ product or service that goes in, and the record it leaves behind.

01 · Entry gateIQ Face → NFFICE HR
02 · Work zoneIQ Guardian on site cameras
03 · Yard · hot workIQ Fire thermal watch
04 · 05 · Office → HQNFFICE approval · daily report
Photo read as a planOne construction site: three zones, one record line to HQ. Every industry below gets a drawing like this.
Sheet index · five industries
  1. A-01Construction & Industry

    We put vision AI on the gates and cameras you already have, and turn each site event into an approval and a report for HQ.

    Industry page →
  2. A-02Manufacturing

    We inspect every part, watch machines for heat, count shifts at the gate — and link each problem to the machine, shift and lot behind it.

    Industry page →
  3. A-03Local & foreign-invested companies

    We run the entity's daily work — approvals, people, sales and money — in each person's language, and connect it to HQ.

    Industry page →
  4. A-04Smart city & public safety

    For facility operators and integrators: video AI and thermal detection on existing cameras, the data to train city AI, and testing before go-live.

    Industry page →
  5. A-05Mobility & robotics

    We do not build the machine. We make the data it learns from and test that it behaves — from the test track to the release.

    Industry page →
Pick a problem

Pick a problem, and the solution stack assembles

Choose an industry and a site problem: the stack by role, the package and the first step come with it.

Problem picker · 5 industries · 31 site problemsCycles on its own · click a problem to pin it

Example site: a Korean contractor's plant build in Da Nang, 14 subcontractors on one gate.

Our role hereWe put vision AI on the gates and cameras you already have, and turn each site event into an approval and a report for HQ.

Industry page · Construction →

Example site: a Japanese-owned components plant in Hai Phong, three shifts, two assembly lines.

Our role hereWe inspect every part, watch machines for heat, count shifts at the gate — and link each problem to the machine, shift and lot behind it.

Industry page · Manufacturing →

Example: a US-owned distributor in Ho Chi Minh City reporting to its parent in Chicago.

Our role hereWe run the entity's daily work — approvals, people, sales and money — in each person's language, and connect it to HQ.

Industry page · Local & FDI →

Example: a transit operator's interchange station and its control room; a partner integrator holds the city contract.

Our role hereFor facility operators and integrators: video AI and thermal detection on existing cameras, the data to train city AI, and testing before go-live.

Industry page · Smart city →

Example: an autonomous-shuttle team in Munich and a warehouse-robot maker in Osaka, both sending data to INFINIQ.

Our role hereWe do not build the machine. We make the data it learns from and test that it behaves — from the test track to the release.

Industry page · Mobility & robotics →
Problem · 01 Entry gate

Crews and day workers change daily; paper sign-in allows proxy check-ins and no one knows who is on site now.

What it leaves

Entry log with snapshot · attendance per subcontractor · live headcount and muster list

First step in this industry

Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).

Problem · 02 Work zones — crane, scaffold, excavation

Missing helmets and harnesses, people inside the crane swing or the excavation edge — too many cameras, too few eyes.

What it leaves

PPE or intrusion event with snapshot, pushed to the zone's site manager

First step in this industry

Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).

Problem · 03 Material yard & hot work

Welding sparks near formwork and fuel; heat builds after the shift, when few people are watching.

What it leaves

Staged thermal alarm to the on-call lead · event log with time and place

First step in this industry

Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).

Problem · 04 Site office

Permits, checklists and delivery notes stay on paper; corrective actions get lost in chat.

What it leaves

Corrective action approved and tracked · paper forms as data · cost per site

First step in this industry

Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).

Problem · 05 Head office

HQ wants a daily safety picture in its own language, not hours of footage.

What it leaves

Daily safety report in English for the parent company · repeat patterns by zone, hour and subcontractor

First step in this industry

Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).

Problem · 01 Gate & shift change

Three shifts, night work and overtime are reconciled by hand at month-end.

What it leaves

Shift attendance, overtime against the legal cap, payroll-ready data

First step in this industry

QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).

Problem · 02 Production line

Visual inspection is sampled and tiring; defects are written down and seen too late.

What it leaves

Pass / fail per part, defect image by type, yield per line and shift

First step in this industry

QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).

Problem · 03 Equipment & electrical room

Overheating panels, motors and bearings look normal until there is smoke.

What it leaves

Staged heat alarm with thermal snapshot · repair work order in NFFICE

First step in this industry

QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).

Problem · 04 Danger zones & warehouse

Forklift lanes, robot cells and restricted stores are entered without permission; visitors wander.

What it leaves

Intrusion and PPE events per zone · visitor entry and exit log

First step in this industry

QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).

Problem · 05 Maintenance & quality office

Machine, quality and maintenance data sit in different systems, so the root cause takes days.

What it leaves

Likely cause (same machine, shift, lot) · maintenance request approved · lot trace report

First step in this industry

QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).

Problem · 06 Machine software

Controllers and devices need software built and validated by a team that can stay on it.

What it leaves

Device software and integration · test report per release

First step in this industry

QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).

Problem · 01 Office entrance

Staff, visitors and auditors come in with paper sign-in and shared badges.

What it leaves

Entry log by person · pre-registered visitors with host notice

First step in this industry

NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.

Problem · 02 Drafts & approvals

Vietnamese drafts wait for managers who read another language; HQ approval rules are not followed.

What it leaves

Approved document with original and translation kept together, under HQ approval rules

First step in this industry

NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.

Problem · 03 HR & attendance

Vietnamese leave, holiday and overtime rules; work permits for expatriate staff.

What it leaves

Rules per entity · monthly close · permit and visa expiry alerts

First step in this industry

NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.

Problem · 04 Finance & accounting

Multi-currency expenses, Vietnamese e-invoices and re-typing into the accounting system.

What it leaves

Pending voucher in accounting · invoices read into data · amounts shown in the HQ currency

First step in this industry

NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.

Problem · 05 Sales

Korean and Vietnamese sales staff keep separate lists; tax codes and invoices are checked by hand.

What it leaves

One pipeline from lead to tax invoice · tax-code check on every account

First step in this industry

NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.

Problem · 06 IT & HQ systems

HQ ERP and local tools do not talk; a launch in Vietnamese shows broken text and dates.

What it leaves

Connectors to HQ systems · a dedicated team that works in your language · localization test report

First step in this industry

NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.

Problem · 07 Head office

HQ wants this month's status in its own language, with the numbers behind it.

What it leaves

Monthly report in English for the US parent · questions answered with sources

First step in this industry

NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.

Problem · 01 Staff & restricted entrances

Control rooms, plant rooms and staff areas are opened with shared cards.

What it leaves

Face-based access log per door

First step in this industry

Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).

Problem · 02 Concourse, platform & plaza

Crowding, loitering, falls and intrusion across hundreds of feeds.

What it leaves

Event cards with snapshot instead of watching every feed

First step in this industry

Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).

Problem · 03 Electrical rooms, car parks & charging

Panels and EV chargers overheat out of sight, often at night.

What it leaves

Early heat alarm with location

First step in this industry

Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).

Problem · 04 Control room

Events from different systems arrive on different screens; actions are not recorded.

What it leaves

One event timeline · events sent to the existing VMS or operations centre · action report

First step in this industry

Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).

Problem · 05 Video data & privacy

Faces and plates are personal data; city AI lacks local training data.

What it leaves

Masked footage before storage or sharing · labelled video datasets

First step in this industry

Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).

Problem · 06 Before go-live

A city system must hold under load and be checked for vulnerabilities before it opens.

What it leaves

Load and vulnerability test report

First step in this industry

Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).

Problem · 01 Test vehicle & robot cell

Driving and grasping data is costly to collect and rarely covers the hard cases.

What it leaves

Collected and cleaned sessions: video, LiDAR, teleoperation demos

First step in this industry

A paid pilot: 500 labelled samples or one test cycle.

Problem · 02 Labelling studio

Precise 3D boxes, tracks and grasp points in large volumes.

What it leaves

Labelled frames and sequences in the customer's format

First step in this industry

A paid pilot: 500 labelled samples or one test cycle.

Problem · 03 Privacy desk

Driving video holds faces and number plates.

What it leaves

Masked data and a processing record

First step in this industry

A paid pilot: 500 labelled samples or one test cycle.

Problem · 04 Data quality

Label errors reach training and are found only when the model fails.

What it leaves

Inspection report per lot before delivery

First step in this industry

A paid pilot: 500 labelled samples or one test cycle.

Problem · 05 Model & edge

Models must run light on the vehicle or robot.

What it leaves

Compressed model for the device

First step in this industry

A paid pilot: 500 labelled samples or one test cycle.

Problem · 06 Validation

Function and safety scenarios must be proven before release.

What it leaves

Scenario test report

First step in this industry

A paid pilot: 500 labelled samples or one test cycle.

Problem · 07 Depot & charging

Battery storage and charging bays can overheat unseen.

What it leaves

Heat alarm for battery areas (proposal)

First step in this industry

A paid pilot: 500 labelled samples or one test cycle.

productserviceProposalproposed use
Site by site

Five industries, zone by zone

For each zone: the problem, the product or service, and the record it produces.

Notes — INFINIQ’s role on this site
  1. Solution supplier

    IQ Guardian, IQ Fire, IQ Face and NFFICE, bundled as Site Safety.

  2. Builder & integrator

    Survey of existing CCTV, gates and network; install; entries linked to NFFICE HR; site forms in Groupware.

  3. AI data partner

    Proposal: PPE rules tuned on the site's own footage, labelled by AI Data Biz.

  4. Operator & support

    Zones and rules updated as the site moves from foundation to frame to finishing; local support.

  1. 1Entry gate

    Crews and day workers change daily; paper sign-in allows proxy check-ins and no one knows who is on site now.

    Record left behind

    Entry log with snapshot · attendance per subcontractor · live headcount and muster list

  2. 2Work zones — crane, scaffold, excavation

    Missing helmets and harnesses, people inside the crane swing or the excavation edge — too many cameras, too few eyes.

    Record left behind

    PPE or intrusion event with snapshot, pushed to the zone's site manager

  3. 3Material yard & hot work

    Welding sparks near formwork and fuel; heat builds after the shift, when few people are watching.

    Record left behind

    Staged thermal alarm to the on-call lead · event log with time and place

  4. 4Site office

    Permits, checklists and delivery notes stay on paper; corrective actions get lost in chat.

    Record left behind

    Corrective action approved and tracked · paper forms as data · cost per site

  5. 5Head office

    HQ wants a daily safety picture in its own language, not hours of footage.

    Record left behind

    Daily safety report in English for the parent company · repeat patterns by zone, hour and subcontractor

  6. The dashed line is the record’s path; the lit zone and its card move together. Hover a card or a number to hold one.

Notes — INFINIQ’s role on this site
  1. Solution supplier

    QC Automation, IQ Fire, IQ Guardian, IQ Face, NFFICE — Smart Quality and Smart Attendance.

  2. Builder & integrator

    Camera and lighting at the inspection point; links to MES, ERP and payroll; embedded and IoT work.

  3. AI data partner

    Good and defective part images labelled so the inspection model learns your products.

  4. Independent validator

    Device and embedded software validation.

  5. Operator & support

    Models retrained when products or lines change; monthly review.

  1. 1Gate & shift change

    Three shifts, night work and overtime are reconciled by hand at month-end.

    Record left behind

    Shift attendance, overtime against the legal cap, payroll-ready data

  2. 2Production line

    Visual inspection is sampled and tiring; defects are written down and seen too late.

    Record left behind

    Pass / fail per part, defect image by type, yield per line and shift

  3. 3Equipment & electrical room

    Overheating panels, motors and bearings look normal until there is smoke.

    Record left behind

    Staged heat alarm with thermal snapshot · repair work order in NFFICE

  4. 4Danger zones & warehouse

    Forklift lanes, robot cells and restricted stores are entered without permission; visitors wander.

    Record left behind

    Intrusion and PPE events per zone · visitor entry and exit log

  5. 5Maintenance & quality office

    Machine, quality and maintenance data sit in different systems, so the root cause takes days.

    Record left behind

    Likely cause (same machine, shift, lot) · maintenance request approved · lot trace report

  6. 6Machine software

    Controllers and devices need software built and validated by a team that can stay on it.

    Record left behind

    Device software and integration · test report per release

  7. The dashed line is the record’s path; the lit zone and its card move together. Hover a card or a number to hold one.

Notes — INFINIQ’s role on this site
  1. Solution supplier

    NFFICE Groupware, HR, CRM and Finance; OCR Editor; HQ Reporting.

  2. Builder & integrator

    Approval lines from HQ regulations, document migration, HQ ERP connectors, a dedicated team (ODC).

  3. Independent validator

    Localization testing of screens, translation, dates and currency.

  4. Operator & support

    Rules updated for new entities and law changes; support in English, Vietnamese, Japanese and Korean.

  1. 1Office entrance

    Staff, visitors and auditors come in with paper sign-in and shared badges.

    Record left behind

    Entry log by person · pre-registered visitors with host notice

  2. 2Drafts & approvals

    Vietnamese drafts wait for managers who read another language; HQ approval rules are not followed.

    Record left behind

    Approved document with original and translation kept together, under HQ approval rules

  3. 3HR & attendance

    Vietnamese leave, holiday and overtime rules; work permits for expatriate staff.

    Record left behind

    Rules per entity · monthly close · permit and visa expiry alerts

  4. 4Finance & accounting

    Multi-currency expenses, Vietnamese e-invoices and re-typing into the accounting system.

    Record left behind

    Pending voucher in accounting · invoices read into data · amounts shown in the HQ currency

  5. 5Sales

    Korean and Vietnamese sales staff keep separate lists; tax codes and invoices are checked by hand.

    Record left behind

    One pipeline from lead to tax invoice · tax-code check on every account

  6. 6IT & HQ systems

    HQ ERP and local tools do not talk; a launch in Vietnamese shows broken text and dates.

    Record left behind

    Connectors to HQ systems · a dedicated team that works in your language · localization test report

  7. 7Head office

    HQ wants this month's status in its own language, with the numbers behind it.

    Record left behind

    Monthly report in English for the US parent · questions answered with sources

  8. The dashed line is the record’s path; the lit zone and its card move together. Hover a card or a number to hold one.

Notes — INFINIQ’s role on this site
  1. Solution supplier

    IQ Guardian, IQ Fire and IQ Face on the operator's existing cameras.

  2. Builder & integrator

    Integration with the existing VMS or operations centre, directly or as a partner to the prime integrator.

  3. AI data partner

    Video datasets and masking for city AI.

  4. Independent validator

    Performance, load and security testing before go-live.

  5. Operator & support

    Rules per place and hour; monitoring and local support.

  1. 1Staff & restricted entrances

    Control rooms, plant rooms and staff areas are opened with shared cards.

    Record left behind

    Face-based access log per door

  2. 2Concourse, platform & plaza

    Crowding, loitering, falls and intrusion across hundreds of feeds.

    Record left behind

    Event cards with snapshot instead of watching every feed

  3. 3Electrical rooms, car parks & charging

    Panels and EV chargers overheat out of sight, often at night.

    Record left behind

    Early heat alarm with location

  4. 4Control room

    Events from different systems arrive on different screens; actions are not recorded.

    Record left behind

    One event timeline · events sent to the existing VMS or operations centre · action report

  5. 5Video data & privacy

    Faces and plates are personal data; city AI lacks local training data.

    Record left behind

    Masked footage before storage or sharing · labelled video datasets

  6. 6Before go-live

    A city system must hold under load and be checked for vulnerabilities before it opens.

    Record left behind

    Load and vulnerability test report

  7. The dashed line is the record’s path; the lit zone and its card move together. Hover a card or a number to hold one.

Notes — INFINIQ’s role on this site
  1. AI data partner

    Collection, 3D and physical-AI labelling, masking and data QA — the core of the work here.

  2. Independent validator

    Function and safety scenario validation; AI model evaluation.

  3. Builder & integrator

    Edge AI and model compression; embedded software.

  4. Operator & support

    A steady labelling team per programme, scaled up or down by batch.

  1. 1Test vehicle & robot cell

    Driving and grasping data is costly to collect and rarely covers the hard cases.

    Record left behind

    Collected and cleaned sessions: video, LiDAR, teleoperation demos

  2. 2Labelling studio

    Precise 3D boxes, tracks and grasp points in large volumes.

    Record left behind

    Labelled frames and sequences in the customer's format

  3. 3Privacy desk

    Driving video holds faces and number plates.

    Record left behind

    Masked data and a processing record

  4. 4Data quality

    Label errors reach training and are found only when the model fails.

    Record left behind

    Inspection report per lot before delivery

  5. 5Model & edge

    Models must run light on the vehicle or robot.

    Record left behind

    Compressed model for the device

  6. 6Validation

    Function and safety scenarios must be proven before release.

    Record left behind

    Scenario test report

  7. 7Depot & charging

    Battery storage and charging bays can overheat unseen.

    Record left behind

    Heat alarm for battery areas (proposal)

  8. The dashed line is the record’s path; the lit zone and its card move together. Hover a card or a number to hold one.

Packages

Bundled for the job

Combinations we see often — start with one product and add the rest later.

PartsPackageWhat it doesWhere it is used
Package Smart Attendance

Entry at the gate becomes attendance, overtime and payroll data.

Package Site Safety

People, behaviour and heat on one safety screen.

Package Smart Quality

Defects and heat traced to machine, shift and lot.

Package HQ Reporting

Bilingual approvals, multi-currency expenses, a report HQ reads in its own language.

Package Visitor & Security

Pre-registered visitors enter by face; restricted zones watched in real time.

Package ProposalData → validation loop

Collection, labelling, data QA and scenario validation under one contract and one project lead.

How it starts

Survey, pilot, rollout, operate

Small and measurable first; the same steps in every industry.

01Survey

Walk the site; check cameras, gates, networks, systems and data; agree the targets.

Example: 1–2 weeks02Lead · Builder & integrator
02Pilot

One gate, line, site, entity or data batch; tuned on your own footage, documents or data.

Example: 4–8 weeks01Lead · Solution supplier
03Rollout

More sites and entities; NFFICE workflows, integrations and HQ reports switched on; testing before go-live.

Example: 2–6 months02Lead · Builder & integrator
04Operate

Monitoring, rule and model updates as sites change, monthly review, support in three languages.

Ongoing05Lead · Operator & support
First step, by industry
01Construction →

A site survey of one project: the gate, two or three high-risk zones and the cameras already there.

Site Safety pilot on one gate and the crane and welding zones (Example: 4–8 weeks).

02Manufacturing →

Pick one inspection point or one gate. We look at the line, lighting and sample parts, or at the shift rules.

QC proof of concept on your own good and defective samples, or Smart Attendance on one gate (Example: 4–8 weeks).

03Local & FDI companies →

A workshop on HQ approval rules and the forms the entity uses most.

NFFICE Groupware for one entity, with approval history migrated; HR and Finance added on the same accounts.

04Smart city →

One facility — a station, a public building or a park — with the cameras it already has.

Two or three event types on a camera group, with masking rules agreed first (Example: 4–8 weeks).

05Mobility & robotics →

A call on sensors, formats and the label guide; a sample of the customer's data.

A paid pilot: 500 labelled samples or one test cycle.

Industries

Open an industry

Each page goes deeper: challenges, solutions and a day with INFINIQ.

Tell us the site and the problem — we start with a survey and a small pilot.

FAQ

About our role

Are you a product company or a system integrator?

Both, on purpose. We build the products (NFFICE, the IQ series, QC Automation, OCR Editor) and also survey, install and connect them. On large public projects we can join as a partner to the prime integrator.

Do we have to replace our cameras, gates or ERP?

Usually not. Existing cameras and turnstiles are checked in the site survey and reused where they can be; Development Biz connects to the ERP, HR or VMS you already run.

Can we buy one product, not a package?

Yes. Each product works on its own. Packages are combinations we see often; you can start with one and add the rest later.

Who runs the system after go-live?

Your team runs the site; we monitor, update rules and models when the site changes, and support you locally in English, Vietnamese, Japanese and Korean.

Do you build robots or autonomous vehicles?

No. In mobility and robotics we make the training data and validate behaviour; the machine and its model stay yours.

Where does video and face data stay?

On your servers or in a dedicated cloud — agreed in the security review. Only events and reports need to leave the site, and personal data can be masked first.

Can one project use solutions and services together?

Yes — for example QC Automation with defect labelling from AI Data Biz and MES integration from Development Biz, under one project lead.

What is the smallest first step?

A site survey, then a pilot on one gate, line, site or entity — or, for data and testing, 500 labelled samples or one test cycle.

How long does it take from survey to full rollout?

As an example, a survey takes one to two weeks, a pilot four to eight weeks and the rollout to more sites and entities two to six months. Operation then continues with monthly reviews.

Are faces and number plates masked before footage is shared?

Yes. AI Data Biz de-identifies footage before it is stored or shared and keeps a processing record, under rules such as the PDPL 91/2025/QH15 (VN), PIPA (KR), APPI (JP) or GDPR (EU). On smart city pilots the masking rules are agreed before the first camera group goes live.

Talk to the team
that builds it.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top