Scope and price first,then we build to the drawing

Requirements, WBS, milestones and acceptance criteria are agreed in writing before the build starts.
Changes go through a change request with its own estimate; the warranty starts on the acceptance date.

01What fixed scope means

What is in scope, what is out

A fixed price holds only for the scope written down; anything else is a change request.

IN signed scope
OUT change request
INwritten down and signed5
OUTgoes through a change request5
Screens and functions listed in the signed requirements
Integrations named with their API version
Non-functional targets, e.g. p95 response under 2 s (example)
Browsers, OS versions and devices to support
Data migration with a stated record count
×Content entry not listed in the requirements
×New features raised during UATCR-015
×Third-party licence and cloud fees
×Operation after the warranty period
×Rework caused by a changed external API
Fits

Requirements can be signed before design, the budget line is fixed and the end date is clear.

Does not fit

The product is still being discovered or priorities change every sprint: a monthly team or T&M fits better.

02Requirements to warranty

Five stages, each with an exit

Each stage ends with a signed document, and the next stage starts from it.

S1Requirements1–2 weeks (example)
1–2 weeks (example)
1
EXIT S1Requirements spec signed; open questions closed or listed as assumptions.signed document
2
S2WBS and plan1–2 weeks (example)
1–2 weeks (example)
3
EXIT S2Every requirement traced to a work package; the plan is baselined.signed document
4
S3Build by milestone2–4 weeks per milestone (example)
2–4 weeks per milestone (example)
5
EXIT S3Milestone demo; internal QA pass rate at least 95 % (example).signed document
6
S4UAT and acceptance1–3 weeks (example)
1–3 weeks (example)
7
EXIT S4Acceptance sheet signed; no open P0 or P1 defect.signed document
8
S5Warranty1–3 months from acceptance (example)
9

S1stage, with its weeks (example)EXITthe signed document that closes it

  • R1Go-live itself takes 1–3 days inside S4 (example).
  • R2A stage cannot start before the previous exit document is signed.
03Estimation

From function points to hours

Count what the system stores and exchanges, weight it, then convert to hours.

TYPEWHAT IS COUNTEDTALLYNWFP
ILFInternal files the system keeps6×1060
EIFFiles read from other systems3×721
EIInputs that change data18×472
EOOutputs with calculation10×550
EQSimple look-ups12×448
Total06081153203251FP
× 8 h per FP2,008h
+ 15 % reserve2,310h
(INT) IFPUG weights, average complexity · (example)
FP×8 +15%02,310
  • (INT)IFPUG counting: weights for average complexity are ILF 10, EIF 7, EI 4, EO 5, EQ 4.
  • (KR)KOSA software project cost guide (2025 edition) prices public projects as FP × FP unit price.
  • The FP total is checked against a bottom-up WBS sum; a gap over 15 % is re-estimated (example).
  • The reserve is a separate line, reported at every milestone; using over half of it triggers a review.
04Change requests

One change, one form, one price

No scope change by word of mouth: each one is logged, sized and signed.

CR-014LoggedImpact analysisApprovedRaised by the customer PM, Busan office (example)

Add a second approval step for orders above a set amount

Scope2 screens, 1 rule, 1 report column
Days+6 working days (example)
Amount+4 % of the contract value (example)
RiskTouches the payment flow: regression set re-run
Change board decisionApproveRejectWait
Approve
ADD-07addendum signed
  1. 01Logged within 1 business day of the request (example).
  2. 02Impact analysis within 3 business days (example).
  3. 03A change board of both PMs and the architect decides.
  4. 04Approved: an addendum is signed and the plan is re-baselined.
05Acceptance

What “accepted” means on paper

Criteria are written per function before the build; UAT checks them and a signature closes it.

Accepted by (customer PM)
Acceptance sheet · M3(example)
AC-01Sign-in with the customer’s SSOPass ✓
AC-02Daily order export as CSVPass ✓
AC-03p95 response under 2 s with 200 users (example)Pass ✓
AC-04Migration of 120,000 customer records (example)Pass ✓
AC-05Printed invoice layoutWaived → CR-015
EXIT CRITERIA
0 open P0 and P1 defects.
Every criterion passed or waived in writing.
Open P2 and P3 defects listed with fix dates.
Deemed acceptance (example clause)10business days

If there is no written reply within 10 business days of delivery, the milestone counts as accepted (example clause).

D+0 deliveredD+10 no reply
counts as accepted
Invoice trigger
Signed acceptance sheet→Milestone invoice

The signed sheet is the trigger for the milestone invoice.

06Deliverables and handover

Everything handed over at the end

The list is in the contract, so handover is a check, not a negotiation.

Handover checklistlisted in the contract
012345678/ 8
gitSource code with full Git history and release tags
docArchitecture document and decision records (ADR)
apiAPI specification in OpenAPI format
tstTest report: cases, results, open defects
opsRunbook and operations guide
ciBuild and deployment pipeline configuration
keyAccount and key handover list; keys rotated after handover
ipSigned IP assignment and open-source licence list
  • Repositories sit in the customer’s own accounts from day one, so nothing has to be copied out at the end.
  • Two knowledge-transfer sessions of 2 hours each are part of the final milestone (example).
07Contract rules by country

Rules that shape a fixed-price deal

Where the customer is decides which rules apply to scope changes and acceptance.

NO.COUNTRYCLAUSESTATUS
A(KR)Software Promotion Act, Art. 50In force since Dec 2020
B(KR)Enforcement decree, Art. 47In force
C(JP)民法 Art. 632 請負 / 656 準委任As amended Apr 2020
D(VN)Civil Code 2015, Art. 513–521In force
E(EU)Germany, BGB § 640(2)In force since Jan 2018
F(US)17 U.S.C. § 101In force
  • Ain public SW projects a task review committee fixes the scope and adjusts amount and period when it changes.
  • Bthe result is notified within 14 days, extendable once by 14 days.
  • C民法 Art. 632 請負 promises a finished result; Art. 656 準委任 promises careful work, paid by time or by output.
  • DCivil Code 2015 Art. 513–521 govern service contracts; Art. 520 allows unilateral termination with notice and compensation.
  • Edelivered work counts as accepted after a set deadline unless refused with a named defect.
  • Fsoftware written by a contractor is usually not work made for hire, so the SOW carries a written IP assignment.
FAQ

Project-based questions

When is a fixed price the wrong choice?

When requirements cannot be signed before design, or priorities change every sprint. A monthly dedicated team or time and materials fits better then.

How is the reserve in the estimate used?

It is a separate line of 10–20 % of the effort (example) for estimate errors inside the agreed scope, not for new features. Its balance is reported at every milestone.

What if our requirements are not clear yet?

Start with a short discovery phase of 1–2 weeks (example) paid by time, then fix the price for the build on the signed requirements.

Who owns the source code?

The customer. Rights move by a signed IP assignment on final payment, and every open-source licence used is listed.

How long is the warranty?

It is written in the contract, commonly 1–3 months from acceptance (example). Defects against the agreed criteria are fixed free; new requests become change requests.

Can a project start before the contract is signed?

Only a paid discovery phase under a short letter of intent; the build starts after the contract and the requirements are signed.

In which languages are documents written?

Korean, English, Japanese or Vietnamese. The language of the contract and of the acceptance sheet is agreed at the start.

Tell us what you
need built.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top