Defects and heat,traced to their cause.

QC Automation inspects every part, IQ Fire watches machines for overheating, and AI Ontology links each problem to the machine, shift and lot behind it.

Limit samples · dent · class-A surfaceRev. C
OKNG
01
0.05 mmOK
02
0.10 mmOK
03
0.15 mmOK
04
0.20 mmOKmax OK
05
0.25 mmNGmin NG
06
0.35 mmNG
07
0.50 mmNG
Approved · QACustomer SQE
Inline inspection

Judged against the same board

The camera learns from, and is checked against, the limit samples your inspectors already use. Parts between 04 and 05 are where people disagree — they go to an inspector, and into the next training round.

Sample limits and depths; your defect catalogue sets the real ones.

Pareto

Which defects to fix first

The inspection cell sorts every reject by type, so the week ranks itself — by count, and weighted by what each defect costs.

By countWeighted by cost
0%50%80%100%Dent412Scratch168Burr97Wrinkle54Oil stain31Crack18Other12Dent412Crack216Wrinkle108Scratch84Burr78Oil stain6Other12

Sample week, Line 2 · cost weights are illustrative · Pareto, after J. M. Juran: the vital few

By count73%

Dent and scratch are 73% of the week. Three types pass the 80% line.

By cost25%

Crack is 2% of the count but about a quarter of the cost — scrap, and the risk of an escape to the customer.

Behind each bar

Every count is a result with an image, a part or lot ID and a time, so the ranking can be checked part by part.

SPC

Eight patterns that fire before a limit

Run rules read the order of the points, not only their size. Which rules to switch on is set per characteristic — each extra rule adds false alarms.

Line 2 · Press #3 · dent depth, X-bar chart (mm)Still inside the limits — and the alarm has already gone off
08:10 · Line 27 in a row risingDrift: wear, heat, a dragging part
UCL 0.150CL 0.120LCL 0.09006:0007:0008:10
The eight rules — which to switch on is set per characteristic
11 point beyond 3σ

A sudden special cause — broken tool, wrong coil, a missed setting.

WE 1 · Nelson 1
22 of 3 beyond 2σ, one side

A medium shift is starting.

WE 2 · Nelson 5
34 of 5 beyond 1σ, one side

A small shift that stays.

WE 3 · Nelson 6
48 in a row on one side

The mean moved — new material batch, new setting.

WE 4 · Nelson 2 (9)
the alert above57 in a row rising or falling

A drift — wear, heat, a dragging part. The 08:10 alert on Line 2.

AIAG · Nelson 3 (6)
614 alternating up and down

Two streams on one chart — two cavities, two operators.

Nelson 4
715 in a row inside 1σ

Limits too wide, or data mixed before charting.

Nelson 7
88 in a row outside 1σ, both sides

A mixture — two sources with different means.

Nelson 8

Western Electric SQC Handbook (1956) · L. S. Nelson, Journal of Quality Technology (1984) · AIAG SPC manual. Chart values are a sample; the band lines are ±1σ, ±2σ and the 3σ limits.

OEE

Where the hours go

Overall equipment effectiveness splits lost time into three cuts. Two of them are what this package watches.

Planned time
100%
A · Availability loss
−12%
P · Performance loss
−6%
Q · Quality loss
−2%
79%OEE · sample

A × P × Q = 0.88 × 0.93 × 0.97 = 0.79

A

Availability loss

Breakdowns, motor trips, long set-ups

IQ Fire flags a motor running hotter than its sister machine before it trips.

P

Performance loss

Slow cycles and minor stops

Not measured by this package — read from MES or PLC when connected.

Q

Quality loss

Rejects, rework, start-up scrap

QC Automation counts every reject by type; AI Ontology ties it to machine, shift and lot.

Six big losses: S. Nakajima, TPM (1988). IATF 16949 clause 8.5.1.5 asks for maintenance objectives such as OEE, MTBF and MTTR.

Measures

Four numbers to watch

Each defined so it can be counted from the system.

FPYFirst-pass yield
Parts passed at first inspectionParts inspectedratio
Per line and shiftInspection cell
FRRFalse reject rate
Camera rejects found good on re-checkParts inspectedratio
Used to tune limitsRe-check bench
PPMCustomer PPM
Defects reported by the customer × 1,000,000Parts shippedratio
MonthlyShipping · customer
TTCTime to cause
time between
First alarmRoot cause confirmed in the 8D (D4)
HoursNFFICE 8D record

Definitions only — values are measured on your site.

Rules

Four lamps, four duties

The line’s stack light, read as law: what applies while the line runs, when a lot is suspect, when goods are nonconforming, and when a machine runs hot.

  • Running · records kept
  • Suspect · hold
  • Nonconforming · stop, notify, recall
  • Machine heat · check
Running · records kept

(VN) Law on Product and Goods Quality 05/2007/QH12, amended by Law 78/2025/QH15

Producers apply a quality management system and keep records. Goods are classed by risk — low, medium, high (Art. 5); traceability is mandatory for high-risk goods (Art. 6d) and a digital product passport is defined. In force from 1 Jan 2026.

What the record shows

Every result is stored with its image, machine, shift and lot, so you can show which goods are affected and when production was stopped.

Suspect · hold

(VN) TCVN ISO 9001:2015, and IATF 16949 where customers require it

Suspect output is identified, kept apart and controlled as nonconforming until it is cleared (ISO 9001 8.7; IATF 16949 8.7.1.3).

What the record shows

Lot links narrow a hold or recall to the lots that passed the faulty machine, instead of everything made that week.

Nonconforming · stop, notify, recall

(VN) Law on Protection of Consumers’ Rights 19/2023/QH15 and Decree 55/2024/ND-CP

Businesses must stop supplying defective goods promptly, notify publicly and recall them, and bear liability for the damage they cause.

What the record shows

The record shows which goods are affected and when production was stopped — the basis for the notice and the recall list.

Machine heat · check

(VN) Law on Fire Prevention, Fighting and Rescue 55/2024/QH15 and Decree 105/2025/ND-CP

Facilities keep fire-safety conditions, including regular checks of electrical systems and heat sources; required alarm and firefighting systems stay in place.

What the record shows

IQ Fire adds early heat warning and a dated record of checks on motors and panels — on top of, not instead of, the fire alarm system.

Tiers

Inspect, Trace, Prevent

Start on one line and grow with your customers’ demands.

01
Small1 line, 1–2 inspection points
Inspect+5added

One line where escapes or manual inspection cost the most

  • +1–2 inspection cells with defect images
  • +Pass/fail and defect type per part
  • +Yield and defect rate by line and shift
  • +Lot record, Excel export
  • +Model trained on your parts
02
Medium2–4 lines, one plant
Trace+4added

Plants supplying IATF 16949 or demanding OEM customers

✓ Everything in Inspect, on 2–4 lines
  • +SPC charts with run-rule alerts
  • +IQ Fire on drive motors and line panels
  • +AI Ontology: defect ↔ machine, shift, lot
  • +Work orders and corrective actions in NFFICE
03
Large5+ lines or several plants
Prevent+5added

Several lines or plants, with MES and customer reporting

✓ Everything in Trace, 5+ lines or several plants
  • +Two-way MES / ERP and PLC integration
  • +8D draft and customer report pack per lot
  • +Heat trends per asset for planned replacement
  • +Plant-to-plant comparison
  • +Scheduled model retraining
FAQ

Questions we hear often

Does it replace our inspectors?

It takes over repetitive visual checks at the line. Inspectors handle borderline parts, re-checks of rejects and the limit samples the model is judged against.

Does a camera inspection need MSA?

Yes. We run an attribute agreement study against your limit samples, including parts near the limit, and repeat it after retraining.

Can the records support IATF 16949 audits and 8D reports?

They give the evidence — images, lot history, SPC and cause links. Your quality team still owns the 8D and its sign-off.

Does IQ Fire replace vibration analysis?

No. Thermal imaging shows a machine running hot; vibration and electrical tests confirm why before major repairs.

Where is the data kept?

On an edge server in your plant, or in the cloud — chosen per site. Results reach MES, ERP and NFFICE by API.

How are the pass and fail limits set?

From the same limit samples your inspectors use, approved by QA and, where needed, the customer’s SQE. The camera is trained and verified on them; parts between the last pass and the first fail go to an inspector and into the next training.

Which defects should we tackle first?

The inspection cell sorts every reject by type, so a week ranks itself — by count and by cost. A defect can be rare yet costly: in the example, cracks are 2% of the count but about a quarter of the cost.

Does it run SPC control-chart rules?

Yes, from the tracing tier. Western Electric and Nelson rules are switched on per characteristic, so a drift such as seven points rising raises an alert before a limit is crossed; each extra rule also adds false alarms.

Can it calculate OEE?

Partly. QC Automation counts the quality losses and IQ Fire flags motors running hot before a trip, which protects availability; performance (slow cycles, short stops) is read from MES or PLC when they are connected.

What does the law require when we find a defective lot?

Under the Law on Protection of Consumers’ Rights 19/2023/QH15 (VN) a business must stop supplying defective products, notify and recall them, and the Law on Product and Goods Quality 05/2007/QH12 (VN), amended by 78/2025/QH15, requires quality records. Comparable rules include the General Product Safety Regulation 2023/988 (EU), the Framework Act on Product Safety (KR), the Consumer Product Safety Act (JP) and the Consumer Product Safety Act (US); the lot records show which products are affected and when production stopped.

Talk to the team
that builds it.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top