EN·VI·KO·JA Contact
Solutions / Packages / Visitor & Security
[ Package · Visitor & Security ]

Know who comes in —and where they go.

Visitors pre-register and enter by face with IQ Face; IQ Guardian watches restricted zones and alerts security the moment someone crosses a line.

Security desk

What the guard on duty sees

Three panes, no video wall: who is inside now, the one alert that needs a person, and the gate log. Sample names.

SECURITY DESK · GATE 0122/10 · 10:40
On site now · 4 + 1
Lê Văn HùngMinh Phát · Tran Thi Mai10:00–12:00
Z4Z3
Park Ji-hoonHQ Chicago · Nguyen Quoc Bao10:00–15:00
Z2
Nguyễn Thị LanAuditor · Le Hoang Anh09:00–17:00
Z2
Kim Min-seoCandidate · HR desk10:30–11:30
Z2
Crew 07 · 6 peopleThanh Long M&E · permit to 24/1008:00–17:00
Z3
CAM 14 · Z4 · 10:40:12
Visitor in a staff-only zone

Lê Văn Hùng · Minh Phát · host Tran Thi Mai

Response01:38
  1. 10:40:12CAM 14 sees a visitor in Z4 — snapshot taken
  2. 10:40:14Guard app and host notified
  3. 10:41:50Guard Đức acknowledges
  4. 10:44Walked back to Z3 with the host
AcknowledgeCall host
Gate log
  • 09:55G01 IN face ✓ Lê Văn Hùng
  • 09:56G01 ID checked · returned
  • 09:58HOST notified · Tran Thi Mai
  • 10:02G02 IN QR pass · walk-in
  • 10:12G01 IN face ✓ Park Ji-hoon
  • 10:25CREW 07 induction ✓ permit 24/10
  • 10:40CAM14 Z4 visitor ⚠
  • 10:41ACK guard Đức · 01:38
  • 10:44Z3 walked back with host
On site now

Visitors and contractors still inside, with host and last gate

Alert

Zone alert: snapshot, camera, zone, time

Gate log

Arrival notice with gate and time

Access zones

Five rings, one visit

Each boundary has its own check. A visit opens only the rings it was approved for — and the core stays closed to visitors.

Every visitor is invited, approved and recognised at the gate — and if they step where they should not, security sees it with a snapshot.

Z0PerimeterZ1GatehouseZ2Lobby & meeting roomsZ3Escorted areasZ4Restricted core
CAM 14 · 10:40Visitor in Z4 — snapshot to the guard
Sample site from the air · zones drawn in the survey
Z0IQ Guardian

Perimeter

Fence line, car park, gate road

CCTV notice signs; after-hours fence-line rule

(VN) Law 91/2025, Art. 32 — people are told they are recorded
Z1IQ Face

Gatehouse

Everyone who enters

Live face inside the visit window, or a QR day pass; ID card checked and handed back

(VN) Law 26/2023, Art. 7 — no holding of ID cards
Z2IQ Face

Lobby & meeting rooms

Approved visitors, blue lanyard

Host gets the arrival notice and meets the visitor in the lobby

Z3Visit record

Escorted areas

Visitors with their host, amber lanyard

Production gallery, line viewing, warehouse aisles — zone level set on the visit

Z4IQ Guardian

Restricted core

Named staff only

Server room, R&D line, warehouse cage — a visitor seen here is flagged with a snapshot

(VN) Law 91/2025, Art. 31 — face templates on the server here: restricted access, monitored

Elsewhere, the same notice duty: (KR) PIPA Art. 25 — CCTV notice board · (JP) APPI Art. 21 — purpose made known · (EU) GDPR Art. 13 — information at collection · (US) Illinois BIPA §15(b) — written release before a face is taken

Restricted zones

A rule drawn on a camera you already have

IQ Guardian rules are drawn per camera in the survey. A breach sends snapshot, camera and zone to the guard on duty — not a video wall to stare at.

● REC · CAM 14 · Server corridor◷ 19:00–06:00 · armed
Visitor · approved Z2
2026-10-22 10:40:12Z4 · staff only
01

Zone

A polygon on the image: anyone inside it after a set time.

02

Line

A tripwire with a direction: crossing the fence or cage line inward.

03

Schedule

The rule is armed only when the area should be empty, e.g. 19:00–06:00.

04

Who

Visitors on the live visit list are told apart from staff in a staff-only zone.

ALERT · CAM 14 · 10:40:12Visitor in Z4 — host Tran Thi Mai

Guard app: acknowledge · call host · walk back

Retention

Kept only as long as the visit needs it

(VN) Law 91/2025 asks for data to be kept only as long as the purpose needs. For a visitor the purpose ends at the exit gate.

12:05 · visit closedThe face template is gone at the exit gate

Only a repeat visitor who agrees keeps it, for a set period.

Data
D-1 19:30consent09:55gate in12:05exit30 days12 months
Who sees it
Face templateSelfie, the day before
×deleted at exit
Gate terminal and server — no person
Name, company, phoneInvitation
×sample: 12 months
Host, security
ID card numberNot collected
checked and handed back
—
Zone snapshotWhen an alert fires
×sample: 30 days, longer only for an incident
Security lead
Consent recordWith the visit
×as long as the visit log
Administrator

(VN) Law 91/2025 — kept only as long as the purpose needs · (KR) PIPA Art. 21 — destroyed without delay · (EU) GDPR Art. 5(1)(e) — storage limitation · (JP) APPI Art. 22 — erased once no longer needed · (US) Illinois BIPA §15(a) — destroyed when the purpose is met, at most 3 years

Periods marked sample are examples — your retention rule sets them.

Evacuation

The muster list is ready when the alarm sounds

Visitors with their host, contractors by company — on the warden’s tablet or printed at the gatehouse.

Muster Point B
Visitors accounted for
01234
/ 4
11:15 alarm → 11:19 everyone checked
MUSTER · DRILL · 22/10 11:15Printed at gate G01
Inside at alarm · 4 visitors + 6 contractors
Lê Văn HùngMinh Phát · Tran Thi MaiG01✓
Park Ji-hoonHQ Chicago · Nguyen Quoc BaoG01✓
Nguyễn Thị LanAuditor · Le Hoang AnhG02✓
Kim Min-seoCandidate · HR deskG01✓
Crew 07 · 6 peopleThanh Long M&EG026/6
Who is on it

Everyone whose last record is an entry: visitors with their host, contractors by company, staff by zone.

Why it is right

Every entry and exit is a face or QR event, so the list is the last record per person, not a paper book.

The fire plan

(VN) Law 55/2024/QH15 and Decree 105/2025/ND-CP: the site fire plan carries the evacuation diagram, and it is drilled at least once a year — the muster points come from it.

Drills elsewhere: (KR) Fire Prevention Act Art. 37 — fire drill at least once a year · (JP) Fire Service Act Art. 8 — fire plan and evacuation drills · (EU) Directive 89/391/EEC Art. 8 — evacuation measures · (US) OSHA 29 CFR 1910.38 — emergency action plan with headcount

Measures

Four numbers to watch

Each comes straight from the visit log or alert log.

PRRPre-registration rate
Visits pre-registered and approvedAll visitsratio
visit 2214 · created D-1 16:00 · approved D-1 19:31
MonthlyVisit log
OVSOverstay rate
Visits still open 30 min after the windowAll visitsratio
visit 2214 · window 10:00–12:00 · out 12:35
MonthlyVisit log
ZRTZone alert response
time between
IQ Guardian alertGuard acknowledges in the app
alert 0912 · CAM14 Z4 · 10:40:12 → ack 10:41:50
Median · minAlert log
MLAMuster list accuracy
Visitors checked at the muster pointVisitors on the listratio
drill 22/10 11:15 · list 4 · checked 4
Per drillMuster list

Definitions only — values are measured on your site.

Bill of materials

What a site needs, by size

Quantities are typical starting points; the survey sets the final list.

G
Small1 gateup to 30 visitors a day
  • Face terminal at gate / lobby1–2
  • Visitor kiosk + badge printer1
  • IQ Face licence1 site
  • IQ Guardian camera channels4–8
  • On-premise server (edge AI)1
  • Survey, install, training1
GGG
Medium2–3 gates30–150 visitors a day
  • Face terminal at gate / lobby3–6
  • Visitor kiosk + badge printer1–2
  • IQ Face licence1 site
  • IQ Guardian camera channels16–32
  • On-premise server (edge AI)1
  • Survey, install, training1
GGGGGG
Largecampus or several sites150+ visitors and contractors a day
  • Face terminal at gate / lobby1 per lane
  • Visitor kiosk + badge printer1 per main gate
  • IQ Face licence1 per site
  • IQ Guardian camera channels48+
  • On-premise server (edge AI)1 per site + standby
  • Survey, install, training1 per site

gate with face terminalcamera with a zone rule — counts are illustrative

Deployment

Four weeks to go-live

Survey, rules, install, pilot, go-live.

Before go-live0123456 / 6
Six things to have ready
  • ✓Zone map: which areas are open, escorted-only or staff-only
  • ✓Host list from HR with work email or phone
  • ✓Privacy notice, consent text and NDA in VI, EN and KO
  • ✓Retention rule: how long visitor faces, ID numbers and snapshots are kept
  • ✓Network and power at each gate and the lobby; camera list with IP and view
  • ✓Guard post procedures and muster points agreed with the fire plan
Ready before week 0
Week 0Survey

Gates, lobby, cameras and network walked; zone map and visit types drafted with security and HR.

Week 1Rules

Consent text, NDA, retention periods, alert routing and guard procedures agreed.

Week 2–3Install

Terminals, kiosk and server installed; Guardian zones drawn on each camera and tuned.

Week 3Pilot

One gate, a group of hosts; guards and reception trained in KO, VI and EN.

Week 4Go-live

All gates live, first evacuation drill with the muster list, monthly KPI review starts.

Week 2–3 · install: terminals in, Guardian zones drawn on each camera
Week 4 · go-live: every gate, one visit record
FAQ

Questions we hear often

What if a visitor does not want to give their face?

They get a QR day pass at the kiosk and an escort. Consent is a choice, so there is always a way in without a face.

How long are visitor faces kept?

As long as your retention rule says — commonly until the visit closes, or a set period for repeat visitors who agree to it.

Can we keep the ID card at the gate as usual?

The Law on Identification prohibits holding another person’s card unlawfully. The guard checks it and hands it back; the badge is tied to the visit, not the card.

Do we need new cameras?

Usually not. IQ Guardian works on IP cameras you already have; the survey checks view, resolution and network for each one.

Who is on the muster list in an emergency?

Everyone whose last record is an entry: visitors with their host, contractors by company, staff by zone.

How does a visitor get registered?

The host sends an invitation, the visitor gives consent and a selfie the day before, and the visit is approved for set zones and times. At the gate the face opens the lane and the host gets an arrival alert; walk-ins get a QR day pass at the kiosk.

What happens if a visitor walks into a restricted area?

IQ Guardian rules drawn on your existing cameras pick it up, and the duty guard gets the snapshot, camera, zone and time in the guard app. The guard acknowledges, calls the host and walks the visitor back, and the response time is recorded.

How are contractors who come every day handled?

In the Plus tier they are enrolled by company, with safety induction and permit expiry on each record. Entry stops when the permit lapses, and crews appear by company on the on-site list and the muster list.

How long does it take to go live?

About four weeks for one site: survey in week 0, rules in week 1, installation in weeks 2–3, a pilot at one gate in week 3, and all gates live in week 4 with the first evacuation drill.

Which privacy laws apply to visitor faces?

A face is biometric, sensitive data under the Personal Data Protection Law 91/2025/QH15 (VN) and Decree 356/2025/ND-CP (VN): consent must be explicit, and data is kept only as long as the purpose needs. Visitors from abroad often expect the standard they know at home — PIPA (KR), APPI (JP), GDPR (EU) or US state laws such as BIPA (US) — so the notice and consent text come in Vietnamese, English and Korean.

Talk to the team
that builds it.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top