A team grows by role, not by headcount alone.
Testers to developers is often 1 : 3 to 1 : 5, set by risk, not by habit (example).
Test impact analysis picks tests per change; the full suite still runs every night.
Meta’s predictive test selection caught over 99.9 % of faulty changes while running about a third of the dependent tests.
Shift-left: review stories for testability, unit and API tests first. Shift-right: smoke checks and crash rates after release.
The matrix starts from your own analytics, then adds what each market uses.
In-market testers cover what a lab cannot: local SIMs, cards, shops and streets.
Exploratory sessions of 60–90 minutes, each with a charter: explore … with … to discover …
Debrief after each session: past, results, obstacles, outlook (PROOF).
Testers sign your NDA; builds go out through TestFlight or Play internal testing.
The QA lead reviews and de-duplicates crowd findings before they reach your Jira.
States are agreed at kickoff so both sides read the board the same way.
Report complete with build, device, steps, video
Severity and priority set
Fix committed and linked
Fix deployed to the test environment
Passes on the same device and OS
Root cause tagged
Severity = impact on the system (S1–S4). Priority = order of fixing (P1–P4). They are set separately.
Reopen rate under 5 % (example)We work in your tools; results and defects come back without copying by hand.
Numbers refresh daily in a shared dashboard; a written report follows every sprint.
Sprint report in Korean, English or Vietnamese (Japanese on request), always in four parts: done, not done, risks, next sprint.
Every rule your data falls under is traced to the control that answers it.
Knowledge sits in shared documents, not in one person’s head.
4 weeks before the change (example)
The successor shadows, then leads while the leaver watches
In your wiki, versioned
Korean, Vietnamese, English terms side by side
The riskiest flows, 10–15 minutes each (example)
The successor shows your PO the flows; checklist signed
The same steps apply if you later move the testing in-house: team charter, onboarding checklist and knowledge base go with it.
Developers write and run automated tests in every build. QA Biz tests independently against the requirements and reports to you directly, with the same five verifications as the Korean HQ Testing Service.
The automation engineer. The test is taken out of the gate, a ticket is opened and the fix is due within the time agreed in the contract. The gate itself is never loosened to make a build pass.
Stable, often repeated flows first; screens that change every sprint stay manual or exploratory. The target share is set after the first month.
Korean, English or Vietnamese, and Japanese for Japanese customers. Titles can carry two languages so developers in Seoul and testers in Vietnam read the same ticket.
Yes. Tests run on your runners and results stay in your repository and tracker. Testers get read access; automation code goes into a repository or branch you own.
A shared dashboard that refreshes daily, and a written sprint report in your language: what was tested, what was not, open risks and the plan for the next sprint.
Mainly by the defect detection percentage: how many defects were found before release compared with all defects, including those found later in production.
Only after masking. Names, phone numbers and IDs are replaced or generated, card numbers are never copied, and the test environment is kept apart from production.
Yes. The handover follows the same six steps as a change of tester, and the team charter, test assets and knowledge base are already in your repository and wiki.
Each rule your data falls under is traced to a control: an NDA and processing contract, your VPN with MFA, least-privilege accounts, masked test data, deletion at the end and an access log. Rules covered include the PDPL 91/2025/QH15 (VN), the Law on Cybersecurity 116/2025/QH15 (VN), PIPA (KR), APPI (JP), GDPR (EU) and CCPA/CPRA (US).