EN·VI·KO·JA Contact
Industries / Construction & Industry
[ Construction & Industry · High-rise frame and site gate ]

Crane radius, edges, hot workwatched zone by zone

Each danger zone has an owner, and every event and fix is recorded.
Crews and day workers enter by face, counted by company and zone for HQ.

Accident figures

Where construction deaths come from

Official figures from Vietnam, Korea and Japan; in all three, construction and falls lead.

01At height
02At height
03At height
04At height
05At height
Fallsleading type of fatal accident (VN · JP)
On the scaffold face12345at height
Scaffold face · five people at height
(VN) workplace-accident deaths in 2024, all industries; construction among the sectors with most fatal accidents
MOLISA, reported by Viet Nam News, March 2025
.4%
(VN) share of falls from height in 440 fatal construction accidents, 2014–2022
IJSCET research paper, 2024
(KR) construction deaths of 589 accident deaths investigated in 2024
Ministry of Employment and Labor, provisional, March 2025
(JP) construction deaths of 746 work-related deaths in 2024; falls were the leading type (188)
MHLW, final figures, May 2025
Site plan

Six danger zones on one site plan

Each zone has its own hazard, rule and camera; draw the plan once and the cameras follow it.

123456789101112
ABCDEFGH
1
2
3
4
5
6
AAerial · north up (example)
Zone scheduleZone · grid · watched by
  1. 1
    Gate & muster pointB5IQ Face

    Unknown people on site; no count in an alarm→Entry by face; the gate list becomes the muster list

  2. 2
    Crane swing radiusF7IQ Guardian · keep-out zone

    Struck by a load or a swinging hook→Nobody under the load while a lift is on

  3. 3
    Slab edges & openingsC8IQ Guardian · edge zone

    Falls from height→Guardrail, net or anchored harness from 2 m

  4. 4
    Hoist landingF6IQ Guardian · crowding

    Crowding at shift change and lunch→Queue line and rated load posted

  5. 5
    Hot-work bayF11IQ Fire · thermal

    Sparks reaching formwork and insulation→Permit, cleared area and a named fire watch

  6. 6
    Storage & temporary panelsC11IQ Fire · thermal

    Overheating terminals, stacked combustibles→Thermal watch around the clock, staged alarms

NotesSample site: 32-storey tower in Da Nang · 6 zones · 28 CCTV · 4 thermal cameras (example)

Morning entry

Headcount by subcontractor at 07:00

Arrivals from 05:30 build into a count per company and trade before the toolbox talk starts.

05:38Lotus Build
05:44Lotus Build
06:02An Phu Formwork
06:15Mekong MEP
06:31Day worker
06:47Song Han Scaffold
Arrivals at a site gate · morning shift
Gate clock05:3006:0006:3007:0005:3006:0006:3007:00
  1. Lotus Build · rebar0195062
  2. An Phu Formwork · formwork0103448
  3. Mekong MEP · electrical & plumbing052135
  4. Song Han Scaffold · scaffolding081822
  5. Day workers · labour supplier0122427
  6. Main contractor staff02918
  7. Visitors · escorted0014
On site at 07:00056157216

216 on site at 07:00 at a Binh Duong factory build (example)

One entry record
PersonCompanyGateZoneTime

Each entry holds person, company, gate, zone and time; a network drop is buffered on the terminal.

Day workers & proxy check-ins

Paper lists, shared cards and the gate log

A signed list or a lent card turns into paid days nobody worked; a live face at the gate does not.

Gate log today · Binh Duong (example)
In012Denied012Duplicate01Exception01
GATE-01In · Nguyen Van Binh
GATE-02Permit expired
Crews walking in at the site gate · each entry goes to the gate log
gate.log · GATE-01 · GATE-02 · Binh Duong (example)tail -f
  1. 06:02GATE-01 IN · Nguyen Van Binh · An Phu Formwork · live face matched
  2. 06:04GATE-01 DENIED · unknown face · snapshot to security
  3. 06:05GATE-02 DENIED · Mekong MEP permit expired 24 Oct · company admin notified
  4. 06:07GATE-01 IN · first day · enrolled at the HR station with consent
  5. 06:09GATE-02 IGNORED · same person within 2 min · duplicate
  6. 18:20 EXCEPTION · 3 entries without exit · listed for the site clerk
  7. >
Why the gate record matters
  • VN
    Labour Code 2019, Art. 14

    contracts under one month may be oral, so the gate record is often the only proof of days worked

  • VN
    Law on Social Insurance 2024

    compulsory insurance for contracts of one month or more, from 1 Jul 2025

  • KR
    건설근로자법 전자카드제

    public works from KRW 100 m and private works from KRW 5 bn record each tag in and out

  • JP
    Construction Career Up System (CCUS)

    a technician card records site entry and qualifications

Training & toolbox talks

Training status for every crew

Induction, height, hot-work and signaller cards per worker, with expiry checked before work.

016/6 ✓
024/6 · missing · expiring
035/5 ✓
043/5 · missing · expiring
053/4 · missed today
063/3 ✓
Morning toolbox talk · one crew in line
WorkerSite inductionToday’s toolbox talkWork at heightHot workCrane signallerFirst aid
01Le Minh Duc
02Vu Quang Huy!✕
03Pham Thu Ha
04Do Van Long✕!
05Tran Van Phuc–
06Hoang Thi Lan
Valid!Expires within 14 days✕Missing — not allowed on that task–Missed todayNot required for the role

Matrix for one formwork crew (example).

Training rules by country
  • VN
    Decree 44/2016/ND-CP

    six training groups; work on the strict-requirement list needs a safety card

  • KR
    산업안전보건법 제31조

    건설업 기초안전보건교육 4시간, 현장 투입 전

  • JP
    労働安全衛生法 第59条

    education on hiring and special education, e.g. full-harness work

  • US
    29 CFR 1926.1427

    crane operator certification valid 5 years, plus a documented employer evaluation

PPE by zone

What the camera checks in each zone

Rules follow the zone, not the camera; every finding becomes an event with a snapshot and a time.

Helmet · vest
Helmet · vest
Helmet · vest
Helmet · vest
No helmet
Edge zone · harness
1
2
3
Event card (example)Closed
  1. 1CAM 07 · Zone B rebar deck · 09:31
  2. 2No helmet · snapshot sent to the zone owner
  3. 3Fixed on the spot · closed 09:36
BCAM 07 · zone B rebar deck (example)
  1. 1
    HelmetEverywhere past the gate
  2. 2
    High-visibility vestVehicle routes, crane and hoist areas
  3. 3
    Harness near edgesEdge zones on active floors
  4. 4
    Keep-out entryUnder loads, excavation, energised panels
  5. 5
    CrowdingHoist landings and stair cores

NotesCamera height, angle and night lighting decide what can be checked; each camera is tested in the site survey.

Lifting operations

One crane lift in five frames

From the lift plan to the hook coming down: who does what, and what the camera watches.

Rebar 2.4 t (example)R 18 m · within the load chart
1
Keep-out zone drawn
2
Signaller · radio CH 2
Alert received
3
Person under the load
4
Landed 10:24 (example)Zone reopened · log closed
5
⚠ Alert
  1. 1 · Plan

    Load weight, radius and the crane’s load chart checked; rigging chosen.

  2. 2 · Barricade

    Swing radius and load path fenced and drawn as a keep-out zone.

  3. 3 · Signal

    One signaller, one radio channel, agreed hand signals.

  4. 4 · Lift

    A person walking under the load alerts the signaller and the site manager together.

  5. 5 · Land

    Load set down, rigging released, zone reopened and the lift closed in the log.

Notes
  1. 1.(KR) 산업안전보건기준에 관한 규칙 제37조 — tower-crane erection or dismantling stops above 10 m/s gust; operation stops above 15 m/s
  2. 2.(JP) クレーン等安全規則 第31条の2 — crane work stops in strong wind (10-minute mean 10 m/s or more)
  3. 3.(US) 29 CFR 1926.1424 — swing radius barricaded; 1926.1408 — 20 ft clearance from power lines up to 350 kV
  4. 4.(VN) Decree 44/2016/ND-CP — cranes on the strict-requirement list are inspected before use and periodically
Working at height

Fall-protection thresholds by country

The height at which protection becomes mandatory, and which protection comes first.

Anchor point
Full-body harness
Horizontal lifeline
CRebar cage · working at height
Elevation · thresholds (m)
RuleFromWhat comes first
(VN) QCVN 18:2021/BXD2 m

Guardrails and safety nets; harness anchored where collective protection is not possible

(KR) 산업안전보건기준에 관한 규칙 제42조2 m

Working platform → fall-arrest net → safety harness, in that order

(JP) 労働安全衛生規則 第518条2 m

Working floor; full-body harness required above 6.75 m since 2019 (5 m advised in construction)

(US) 29 CFR 1926.501(b)(1)6 ft (1.8 m)

Guardrail, safety net or personal fall arrest; scaffolds from 10 ft (1926.451)

(EU) Directive 2009/104/EC, Annex IIRisk-assessed

Collective protection before personal protection

NotesOn site, edge zones are redrawn on the cameras as each new floor is cast.

Hot work

A hot-work permit from start to close

What the permit holds, how long the fire watch stays, and what keeps watching afterwards.

11 m (35 ft) cleared
Fire watch after close
60:0045:0030:0015:00
then IQ Fire keeps watching
DLevel 5 · bay C3 (example)
Hot-work permit (example)HW-0512
  1. Location & taskLevel 5, bay C3 · welding beam connections (example)
  2. Area clearedCombustibles removed or covered within 11 m (35 ft)
  3. At handExtinguisher and fire blanket at the work point
  4. Fire watchNamed person, stays during work and after it ends
  5. ValidOne shift; re-issued if the area or task changes
  6. Close-outArea checked, signed off; IQ Fire keeps watching the bay
Closed · signed
PermitHW-0512BayL5 · C3Valid1 shiftWatch60:00
Notes
  1. 1.(US) NFPA 51B — fire watch for at least 60 minutes after hot work (since the 2019 edition)
  2. 2.(US) 29 CFR 1926.352(e) — fire watch kept for a sufficient time after the work
  3. 3.(KR) 산업안전보건기준에 관한 규칙 제241조의2 — 화재감시자 배치
  4. 4.(VN) Law 55/2024/QH15 + Decree 105/2025/ND-CP — rules for heat sources, self-inspection, yearly drill
  5. 5.Requested and approved in NFFICE Groupware on the phone, in Korean, Vietnamese or English.
Heat stress

Heat thresholds and rest by country

The levels that trigger duties, drawn over one hot day measured on an open deck (example).

Exposed zone · roof deck6 people on the gate record
WBGT · site meter
07:0026.1°C09:0027.8°C11:0029.6°C13:0031.2°C15:0030.4°C17:0028.0°C
Rest notice · sent20 min rest · 13:00 and 15:00VI · KO · EN · read 6 / 6
Rebar crew on an open roof deck

Hourly WBGT in °C on a Binh Duong roof deck, measured with the site’s own meter (example).

The gate record shows who is working in exposed zones; break notices go to crews in Vietnamese, Korean or English with read counts, and the heat log is kept as a site form.

Thresholds and duties
  • JP
    労働安全衛生規則, from 1 Jun 2025

    WBGT 28 °C or air 31 °C, work over 1 h straight or 4 h a day: reporting system and response steps made known to workers

  • KR
    산업안전보건기준에 관한 규칙, from 17 Jul 2025

    heat index 31 °C for 2 h or more: cooling, shifted hours or rest; 33 °C: 20 min rest every 2 h

  • VN
    QCVN 26:2016/BYT

    WBGT limits for indoor workplaces (continuous work: light 30.0, moderate 26.7, heavy 25.0 °C); open sites fall outside it, so the employer’s heat plan applies

  • US
    No federal OSHA heat standard in force (rule proposed in 2024); California Title 8 §3395

    shade from 80 °F, high-heat procedures from 95 °F

  • INT
    ISO 7243:2017

    the WBGT method used to measure heat stress

Near misses · close calls

From camera event to corrective action

Most events end with a quick fix on the spot; the ones that repeat change training and the plan.

  1. Events raisedPPE, keep-out, edge and crowding events in a week
  2. AcknowledgedZone owner opens the snapshot in the app
  3. Fixed on the spotHelmet on, person out of the zone
  4. Corrective action reportWritten and approved in NFFICE
  5. Repeat patternSame zone, hour or crew, found by AI Ontology
  6. Plan or training changeBarrier moved, crew retrained
BDetail · zone owner phone
● Zone B · rebar deckNo helmet · CAM 07 · 09:31Snapshot attached (example)
AcknowledgeFixed 09:36
Definitions
  1. 1.Near miss — an event that could have caused injury but did not; ISO 45001:2018 treats it as an incident (clause 10.2).
  2. 2.TRIR — recordable cases × 200,000 ÷ hours worked (US OSHA basis).
  3. 3.LTIFR — lost-time injuries × 1,000,000 ÷ hours worked.
Site report

Written in Vietnamese, read in Korean

The daily site report goes from the site office to the Busan HQ with the original beside the translation.

NFFICE · ApprovalVI → EN
Daily site report · 24 Oct
  1. HeadcountNgày 24/10: 216 người trên công trường, 6 đơn vị.24 Oct: 216 on site, 6 companies.
  2. Safety events3 sự kiện mũ bảo hộ, đã xử lý tại chỗ.3 helmet events, fixed on the spot.
  3. HeatNghỉ 20 phút lúc 13:00 và 15:00 cho tổ cốt thép.Rebar crew rested 20 min at 13:00 and 15:00.
Tran Thi Mai→Kim Do-hyunApproved
Site office · the printed daily report, approved in NFFICE
Daily site report · 24 Oct · Binh Duong (example)VI → EN
  1. Headcount
    Ngày 24/10: 216 người trên công trường, 6 đơn vị.24 Oct: 216 on site, 6 companies.
  2. Safety events
    3 sự kiện mũ bảo hộ, đã xử lý tại chỗ.3 helmet events, fixed on the spot.
  3. Heat
    Nghỉ 20 phút lúc 13:00 và 15:00 cho tổ cốt thép.Rebar crew rested 20 min at 13:00 and 15:00.
  4. Training
    2 thẻ hàn hết hạn trong tuần, đã đăng ký đào tạo.2 hot-work cards expire this week; training booked.
  5. Tomorrow
    Đổ bê tông sàn tầng 3, dự kiến 230 người.Level 3 slab pour, about 230 people.
ToKim Do-hyun · HQ safety team, Busan
Received18:42Busan HQ · 24 Oct
From
Tran Thi Mai · site safety officer, Binh Duong
To
Kim Do-hyun · HQ safety team, Busan
How
Drafted in Vietnamese in NFFICE Groupware, read and approved in Korean; the original is kept with the translation.
Getting started

Eight weeks on the first block

Survey to live, side by side: what your site team, INFINIQ and the system each do.

W1
W2
W3
W4
W5
W6
W7
W8
FThe frame's top deck · its edge used as the week scale
Weeks
Your site team
Week 1Walk zones and muster points
Week 2–3Agree zone owners and alert hours
Week 3–5Planned shutdown for IR windows
Week 5–7Crews enrolled; one muster drill
Week 8Zone owners answer alerts
INFINIQ
Week 1Survey gates, cameras, panels, network, power
Week 2–3Zone rules, alarm levels, face-data notice
Week 3–5Face terminals, thermal cameras, edge server
Week 5–7Rules tuned on your footage; heat baseline
Week 8Training in KO · VI · EN, local support
System
Week 2–3Site plan zones set
Week 3–5Streams connected
Week 5–7Pilot events reviewed daily
Week 8Daily safety report to HQ
FAQ

Construction site questions

The building rises every week. Do the zones move with it?

Yes. Edge and keep-out zones are redrawn on the cameras as floors are cast, and the old outlines stay in the history.

How fast is the gate when hundreds arrive at once?

Lanes are sized from your peak arrivals per minute, and each lane opens for one live face at a time.

A day worker comes for one day only. Is enrolment worth it?

Yes; enrolment takes minutes at the HR station with consent, and the template is deleted when the person leaves the site list.

Does it replace the crane’s anti-collision system or load limiter?

No. Those stay on the crane. IQ Guardian watches the ground zone under the load and who walks into it during a lift.

Who receives an alert during a lift?

The signaller and the site manager together, with a snapshot. Routing is set per zone and per hour.

Can the system be our fire watch after welding?

No. A person still stays as the fire watch. IQ Fire adds a thermal record of the bay after the permit closes.

Do you measure workers’ body temperature for heat stress?

No. Heat readings come from your WBGT meter; the system shows who is in exposed zones and keeps the break notices and log.

Can HQ read the daily report on a weekend?

Yes. The report arrives in NFFICE on mobile, in the reader’s language, with the original one tap away.

What if a worker does not agree to face enrolment?

An alternative check-in is agreed with you before go-live, and that person’s entries are recorded the alternative way.

Where is the video kept?

On the edge server at your site by default. Faces in snapshots can be blurred, and retention is set per site before go-live.

Talk to the team
that builds it.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top