Official figures from Vietnam, Korea and Japan; in all three, construction and falls lead.
Each zone has its own hazard, rule and camera; draw the plan once and the cameras follow it.
Unknown people on site; no count in an alarm→Entry by face; the gate list becomes the muster list
Struck by a load or a swinging hook→Nobody under the load while a lift is on
Falls from height→Guardrail, net or anchored harness from 2 m
Crowding at shift change and lunch→Queue line and rated load posted
Sparks reaching formwork and insulation→Permit, cleared area and a named fire watch
Overheating terminals, stacked combustibles→Thermal watch around the clock, staged alarms
NotesSample site: 32-storey tower in Da Nang · 6 zones · 28 CCTV · 4 thermal cameras (example)
Arrivals from 05:30 build into a count per company and trade before the toolbox talk starts.
216 on site at 07:00 at a Binh Duong factory build (example)
Each entry holds person, company, gate, zone and time; a network drop is buffered on the terminal.
A signed list or a lent card turns into paid days nobody worked; a live face at the gate does not.
contracts under one month may be oral, so the gate record is often the only proof of days worked
compulsory insurance for contracts of one month or more, from 1 Jul 2025
public works from KRW 100 m and private works from KRW 5 bn record each tag in and out
a technician card records site entry and qualifications
Induction, height, hot-work and signaller cards per worker, with expiry checked before work.
Matrix for one formwork crew (example).
six training groups; work on the strict-requirement list needs a safety card
건설업 기초안전보건교육 4시간, 현장 투입 전
education on hiring and special education, e.g. full-harness work
crane operator certification valid 5 years, plus a documented employer evaluation
Rules follow the zone, not the camera; every finding becomes an event with a snapshot and a time.
NotesCamera height, angle and night lighting decide what can be checked; each camera is tested in the site survey.
From the lift plan to the hook coming down: who does what, and what the camera watches.
Load weight, radius and the crane’s load chart checked; rigging chosen.
Swing radius and load path fenced and drawn as a keep-out zone.
One signaller, one radio channel, agreed hand signals.
A person walking under the load alerts the signaller and the site manager together.
Load set down, rigging released, zone reopened and the lift closed in the log.
The height at which protection becomes mandatory, and which protection comes first.
Guardrails and safety nets; harness anchored where collective protection is not possible
Working platform → fall-arrest net → safety harness, in that order
Working floor; full-body harness required above 6.75 m since 2019 (5 m advised in construction)
Guardrail, safety net or personal fall arrest; scaffolds from 10 ft (1926.451)
Collective protection before personal protection
NotesOn site, edge zones are redrawn on the cameras as each new floor is cast.
What the permit holds, how long the fire watch stays, and what keeps watching afterwards.
The levels that trigger duties, drawn over one hot day measured on an open deck (example).
Hourly WBGT in °C on a Binh Duong roof deck, measured with the site’s own meter (example).
The gate record shows who is working in exposed zones; break notices go to crews in Vietnamese, Korean or English with read counts, and the heat log is kept as a site form.
WBGT 28 °C or air 31 °C, work over 1 h straight or 4 h a day: reporting system and response steps made known to workers
heat index 31 °C for 2 h or more: cooling, shifted hours or rest; 33 °C: 20 min rest every 2 h
WBGT limits for indoor workplaces (continuous work: light 30.0, moderate 26.7, heavy 25.0 °C); open sites fall outside it, so the employer’s heat plan applies
shade from 80 °F, high-heat procedures from 95 °F
the WBGT method used to measure heat stress
Most events end with a quick fix on the spot; the ones that repeat change training and the plan.
The daily site report goes from the site office to the Busan HQ with the original beside the translation.
Survey to live, side by side: what your site team, INFINIQ and the system each do.
Yes. Edge and keep-out zones are redrawn on the cameras as floors are cast, and the old outlines stay in the history.
Lanes are sized from your peak arrivals per minute, and each lane opens for one live face at a time.
Yes; enrolment takes minutes at the HR station with consent, and the template is deleted when the person leaves the site list.
No. Those stay on the crane. IQ Guardian watches the ground zone under the load and who walks into it during a lift.
The signaller and the site manager together, with a snapshot. Routing is set per zone and per hour.
No. A person still stays as the fire watch. IQ Fire adds a thermal record of the bay after the permit closes.
No. Heat readings come from your WBGT meter; the system shows who is in exposed zones and keeps the break notices and log.
Yes. The report arrives in NFFICE on mobile, in the reader’s language, with the original one tap away.
An alternative check-in is agreed with you before go-live, and that person’s entries are recorded the alternative way.
On the edge server at your site by default. Faces in snapshots can be blurred, and retention is set per site before go-live.