EN·VI·KO·JA Contact
Services / Development Biz / NFFICE customization
[ NFFICE customization · Features and integration ]

NFFICE, fittedto the systems you run

Forms, approval lines and screens fitted to your rules, linked to HQ ERP, HR, accounting, e-invoices and banks.
The systems you already run stay where they are.

Connection map

Every joint around NFFICE

What flows in, what flows out, and how often, for each system a company usually runs.

01 / 157links around NFFICE — what comes in, what goes out, how often
NFFICE01HQ ERP0102IdP0203HR · payroll0304Time clocks0405E-invoice0506Bank0607Mail · meet07One port = one system · each cable runs at its own rhythm
Tag register · around NFFICEliveper eventscheduled
  1. 01
    HQ ERPLive + nightly

    INCost centres, projects, vendors, PO numbers

    OUTApproved expenses and purchases, mapped trial balance

  2. 02
    Identity providerEach sign-in

    INSign-in, groups, joiners and leavers

    OUTSign-in records for audit

  3. 03
    HR & payrollDaily · month-end

    INEmployees, positions, org changes

    OUTApproved leave, overtime, attendance

  4. 04
    Time terminalsScheduled file

    INClock-ins from devices already on site

    OUTNothing; read only

  5. 05
    E-invoice providerPer document

    INIncoming supplier invoices

    OUTInvoices issued on delivery

  6. 06
    BanksDaily

    INStatements

    OUTPayment files

  7. 07
    Mail & meetingsLive

    INGoogle or Microsoft mailboxes

    OUTZoom or Google Meet links

Inside the form

ERP master data inside NFFICE forms

Company-specific fields read live lists from your systems, so nobody types a code by hand.

02 / 151,240ERP codes picked inside the form, read live (example)
Location codeone form field
Barcodethe list from your system
  • CC-SE-1101
  • CC-SE-1102
  • CC-SE-1180
  • CC-HP-205
  • CC-HP-210
  • CC-HP-214
  • CC-NG-301
  • CC-NG-305
  • CC-FR-410
  • CC-FR-412
  • CC-AT-501
  • CC-AT-507
  • PJ-26-018
  • PJ-26-031
  • PJ-26-044
  • V-30402
  • V-30418
  • V-30455
  • E-2190
  • E-2207
  • E-2233
  • AS-04398
  • AS-04412
  • AS-04420
  • CC-SE-1101
  • CC-SE-1102
  • CC-SE-1180
  • CC-HP-205
  • CC-HP-210
  • CC-HP-214
  • CC-NG-301
  • CC-NG-305
  • CC-FR-410
  • CC-FR-412
  • CC-AT-501
  • CC-AT-507
  • PJ-26-018
  • PJ-26-031
  • PJ-26-044
  • V-30402
  • V-30418
  • V-30455
  • E-2190
  • E-2207
  • E-2233
  • AS-04398
  • AS-04412
  • AS-04420
ERP list · 1,240 codes (example)
HQ ERPHQ ERPERP vendor masterHR masterAsset register
HP-PRD-210PJ-26-031V-30418E-2207AS-04412
NFFICE form field
Cost centreHP-PRD-210 · Hai Phong production✓Project / WBSPJ-26-031 · 42% budget left✓VendorV-30418 · tax code checked✓Employee & gradeE-2207 · grade M2 → per diem B✓Asset numberAS-04412 · press line 3✓
Purchase request · company fields (example)read live
  1. Cost centreHQ ERP
    HP-PRD-210 · Hai Phong production▾

    Only open centres of the drafter’s entity

  2. Project / WBSHQ ERP
    PJ-26-031 · 42% budget left▾

    Budget left shown before submit

  3. VendorERP vendor master
    V-30418 · tax code checked▾

    Tax code checked; blocked vendors hidden

  4. Employee & gradeHR master
    E-2207 · grade M2 → per diem B▾

    Grade sets per diem and approval band

  5. Asset numberAsset register
    AS-04412 · press line 3▾

    Repair requests tied to the asset

HQ ERP

From approval to an ERP entry

Five hand-offs between NFFICE and the HQ ERP, each with a status you can see.

03 / 155hand-offs from approval to reconciliation, each with its status
One paymenttwo ledgersNFFICEHQ ERP
Expense · exampleDai Bong Hai Phong · client dinner4,800,000 VND
One card payment = one expense · it lands in two ledgers
One expense, two ledgers (example)
NFFICEApproved

Daebong Hai Phong · client dinner

VND 4,800,000

LocalLocal account under VAS

HQ ERPstatus Posted

HQHQ account Entertainment, in KRW at the day’s rate

ERP document 5100004127 returned

✓Count and amount checked on both sides every day.

expense + attachments ▸◂ 5100004127
  1. 01Approved

    An expense or purchase closes with its rule version.

  2. 02Mapped

    Local accounts mapped to the HQ chart once and reused every time.

  3. 03Sent

    Fields and attachments sent by API or by file.

  4. 04Posted

    The ERP returns its document number to NFFICE.

  5. 05Reconciled

    Count and amount checked on both sides every day.

Sign-in

One company account for every login

NFFICE joins the identity provider HQ already runs, from first day to last.

04 / 151company account for every sign-in
connected · Entra IDconnected · Googleconnected · SAML 2.0connected · OIDC
  • Microsoft & Google sign-in

    Staff use the account they already have, in Entra ID or Google Workspace.

  • SAML 2.0 · OpenID Connect

    Other providers such as Okta or Keycloak joined by standard protocol.

  • Provisioning

    Joiners created and leavers blocked from HR or the IdP; SCIM 2.0 where the IdP offers it.

  • Groups to roles

    IdP groups mapped to NFFICE roles and entity scope.

  • Extra checks

    Two-step verification, password policy and an IP allow-list on top.

The same sign-in for every employee, on day one
Sign in to NFFICE
Continue with company account
Microsoft Entra IDGoogle WorkspaceSAML 2.0 · OktaOpenID Connect · Keycloak

group Finance-HP → role Finance · entity Hai Phong

HR & payroll

HR records and payroll, joined up

Org changes flow in, approved time flows out, and payroll lands in the books.

05 / 151employee record feeds time, payroll and filings
IDE-2207Grade M2Hai Phong
01Org sync
02Terminal import
03Approved time
04Salary journal
05Statutory filing
BadgeHR master record
Payrollpaid from the same record
One employee record, every link starts from it
  1. Org sync

    Transfers and dual roles in the HR master update the org chart and approval lines.

  2. Terminal import

    Clock-ins from terminals already on site imported on a schedule.

  3. Approved time

    Leave and overtime approved in Groupware update attendance.

  4. Salary journal

    An approved run posts to NFFICE Finance or is exported to your accounting system.

  5. Statutory filing

    VN social insurance through a licensed I-VAN provider; KR four insurances by EDI file (example).

E-invoices

E-invoice routes by country

Each entity issues and receives through its own country’s channel; NFFICE keeps the link to the deal.

06 / 155country routes for one invoice — VN · KR · JP · DE · US
VNDecree 254/2026
KRe-tax invoice
JPT-number · JP PINT
DEEN 16931
USPDF · EDI
Receiptseach country, its own route
The same paper trail, a different route in every country
Invoice INV-26-000731 · the same documentfive countries, five routes
  1. VN
    NFFICECertified providerTax authority codeBuyer
  2. KR
    NFFICEASP · ERPNTS by next dayBuyer
  3. JP
    NFFICEQualified invoice · T no.Peppol JP PINTCustomer
  4. DE
    NFFICEEN 16931XRechnung · ZUGFeRDRecipient
  5. US
    NFFICENo federal mandatePDF · EDICustomer
  1. VNVietnam

    Your existing e-invoice provider; issued on delivery confirmation under Decree 254/2026 and Circular 91/2026.

  2. KRKorea

    E-tax invoice through an ASP or the ERP, sent to the NTS by the next day.

  3. JPJapan

    Qualified invoice with a T-number; Peppol (JP PINT) where partners use it.

  4. DEGermany

    EN 16931 (XRechnung, ZUGFeRD): receiving required since 2025, issuing phased in over 2027–28.

  5. USUnited States

    No federal mandate; PDF or EDI per customer, sales tax by state.

Incoming VNIncoming Vietnamese invoices get a suggested account and a confidence score before anyone posts them.

Banks

Payment files and statements matched

A payment file goes to the bank; the statement comes back and closes open payables.

07 / 150lines left to match by hand after the morning run (example)
pain.001 · ACH · Zenginpayment file out · 214
camt.053 · BAI2statement lines in · 214
Matched209 matched · 5 manual
5 to review
Each coin = one line, counted on both sides
Morning match (example)
Statement lines
Matched
Manual match
partial paymentunknown referencedouble bank fee
Format per country · file out, statement in
  1. Vietnam→←

    Bank Open API under Circular 64/2024/TT-NHNN, or host-to-host files

  2. Korea→←

    Firm banking and CMS transfer files

  3. Japan→←

    Zengin-format transfer files; ZEDI remittance data

  4. EU (SEPA)→←

    ISO 20022 pain.001 out, camt.053 statements in

  5. United States→←

    NACHA ACH files; BAI2 statements

Many entities

A different partner system per entity

One NFFICE, routed to each entity’s own ERP, accounting and invoice channel.

08 / 155entities, each with its own hours and partner systems
01 KR
02 VN
03 JP
04 DE
05 US
Five entities · five time zones

Each clock is one entity: its own hours, its own partner systems, one NFFICE behind them.

Header · NFFICE
Outlet 01 · KRDaebong Seoul HQ
  • SAP S/4HANA
  • Entra ID
  • e-tax invoice ASP
Outlet 02 · VNDaebong Hai Phong
  • Local accounting package
  • VN e-invoice provider
  • bank Open API
Outlet 03 · JPDaebong Nagoya
  • Japanese accounting package
  • Zengin files
  • JP PINT
Outlet 04 · DEDaebong Frankfurt
  • HQ SAP company code
  • SEPA camt.053
  • XRechnung
Outlet 05 · USDaebong Atlanta
  • US payroll provider
  • NACHA ACH
  • sales-tax engine

Routing is a setting per entity, not separate code.

Interface spec

What every interface spec pins down

Agreed in writing before build, so both teams test against the same contract.

09 / 157spec lines agreed by both teams before any code
PlugNFFICE
SocketPartner system
Shape agreed firstspec = both shapes
It only goes in when both shapes match
Integration spec · cost centres (example)v1.0
LineNFFICEPartner (HQ ERP)Agreed
  1. 01
    Fields & codes

    Each field, its format and the code lists on both sides.

    Cost centre CC-HP-210KOSTL 4100210✓
  2. 02
    Method

    REST API for live calls, webhooks for events, SFTP / CSV for batches.

    REST API · webhookOData endpoint✓
  3. 03
    Frequency & volume

    e.g. 3,000 expense lines at the month-end peak (example).

    Live · month-end up to 3,000 linesLoad-tested at the same cap✓
  4. 04
    Duplicates

    An idempotency key per document, so a resend never posts twice.

    Idempotency key EXP-26-0412Same key posts once✓
  5. 05
    Failure handling

    Automatic retry, then an alert within 15 minutes (example).

    3 retries · alert within 15 minError-code list returned✓
  6. 06
    Security

    Signed webhooks, scoped API keys, TLS and an IP allow-list.

    Signed webhook · TLS 1.2+Scoped API key · IP allow-list✓
  7. 07
    Owners

    A named owner on each side for changes and incidents.

    Integration lead Lee Min-jiHQ IT Tran Minh✓
Signed by both teams before developmentNFFICE ✓HQ IT ✓
Fit-gap

Measure before we cut

Each requirement is marked standard, setting, extension, link or roadmap before any work starts.

10 / 1564requirements, each given a verdict before work starts (example)
Before cutting64 requirements, one verdict each
Measure first · the verdict decides the work
Fit-gap, 64 requirements (example)Σ 64
Verdicts, 64 requirements
22Standard
25Setting
9Extension
6Link
2Roadmap

Standard + settings = 47 of 64: no code for most of it

  1. Standard

    NFFICE already does it; we show where.

    e.g. Approved leave appearing on the team calendar

    22
  2. Setting

    Admin settings and tables, no code.

    e.g. Director added to purchase requests above VND 10M

    25
  3. Extension

    Built at an extension point, kept apart from the product core.

    e.g. Trip request that works out per diem by city grade

    9
  4. Link

    Data exchanged with a system you already run.

    e.g. Cost centres read from the HQ ERP

    6
  5. Roadmap

    Useful to every customer, so proposed to the NFFICE product team.

    e.g. A standard report many companies ask for

    2

Hanmaru Electronics · Seoul HQ with a Hai Phong entity

Forms

Your paper forms, rebuilt in NFFICE

Ready-made forms are edited by admins; calculations and lookups are added only where needed.

11 / 156paper-form elements carried into the NFFICE form
Your paper form
Cells = fields of your paper form
Template · your paper formtraced into NFFICE
  1. Text, amount, date

    Admins add and reorder fields without code.

    Setting
  2. Attachment & table

    Quotes, photos and item lines kept with the document.

    Setting
  3. Print layout

    Stamped PDF in the entity’s format with department and corporate seals.

    Setting
  4. Embedded calculation

    Per diem, tax, exchange or allowance worked out inside the form.

    Extension
  5. Conditional sections

    An overseas trip shows visa and insurance fields; a domestic one does not.

    Extension
  6. Master-data lookup

    Vendor, project or cost centre picked from a live list.

    Link
Overseas trip request (example)

Hai Phong → Nagoya, 4 nights · city grade A

Per diem JPY 9,000 × 5 days = JPY 45,000, shown in VND at today’s rate

Visa and travel-insurance fields appear because the trip is abroad

Approval lines

Delegation rules as approval lines

HQ writes the table once; the line builds itself from form, amount and department.

12 / 153amount bands, each with its approval line (example)
VND 8,000,000VND 150,000,000VND 350,000,000
Signature1 signature3 signatures5 signatures
The amount on the calculator sets how many people sign
Amount (example)VND 8,000,000Up to VND 10M
Team lead · final
Amount (example)VND 150,000,000Up to VND 200M
Team lead→Finance · consensus→Director
Amount (example)VND 350,000,000Above VND 200M
Team lead→Finance · consensus→Director→General director→HQ · reference
Purchase request bands (example)
  1. Up to VND 10M → team lead, final
  2. Up to VND 200M → team lead, finance in consensus, director
  3. Above VND 200M → + general director, HQ in reference
  • Amount bands

    Bands include their boundary: “up to VND 40M” means VND 40M too.

  • Consensus & reference

    Finance and legal agree in sequence or in parallel; others receive a copy.

  • Delegated final approval

    A team lead closes small amounts as final approver.

  • Proxy & post-approval

    A deputy signs during leave; the owner reviews afterwards.

  • Rule versions

    Each change starts on a date; past documents keep the version they were signed under.

  • Company-specific step

    A step the standard lacks, such as a safety officer for chemical purchases, built as an extension.

Screens & mobile

Screens shaped around the work

Fields, lists, home widgets and the phone layout follow how each team works.

13 / 156screen changes — fields, lists, widgets, design, phone, high-value check
Extra fields on records
Employee recordNguyen Van An

TeamProduction 1

GradeM2

Joined2024-03-04

Safety licence no.SC-2291-HPadded

List views
Saved viewOpen purchase requests
Site: Hai PhongOpen

PR-1031Safety boots × 12012.4M

PR-1029Gloves × 4003.2M

PR-1024Press oil 200 L8.9M

Home widgets
HomeGood morning

Approvals3

Schedule2

Notices1

Clock-in09:02

Safety rounds2 today

Company look
Hanmaru ElectronicsHai Phong entity

Continue with company account

Colours and logo per entity

Phone layout
Travel requestNagoya · 4 nights

Per diem45,000 JPY

ApproverTeam lead

ApproveReturn
High-value confirmation
High-value check480,000,000 VND

over the set limit (example)

Confirm with fingerprint

  • Extra fields on records

    Safety licence number on the employee record, Incoterm on the quote.

  • List views

    Saved filters and columns per team, e.g. open purchase requests by site.

  • Home widgets

    Approvals, schedule, notices and attendance, plus a company tile.

  • Company look

    Logo, colours, login screen and branding per entity.

  • Phone layout

    Custom forms rearranged for one-hand approval.

  • High-value confirmation

    Biometric confirmation on the phone above an amount you set.

Reports

Reports in the shape HQ asks for

Standard templates first; the rest drawn to your HQ’s own layout and timing.

14 / 155reports in HQ’s own layout, sent on schedule (example)
01
02
03
04
05
Sent to HQ
Report set · for HQBuilt to HQ’s layout
Hanmaru Electronics
ReportContentsHQ layoutTiming
  1. Monthly headcount by entityJoiners, leavers and transfers in the HQ grade system.1st working day
  2. Overtime against limitsHours per person against each country’s cap.Weekly
  3. Spend by cost centreApproved expenses and purchases in local and HQ currency.Monthly
  4. Pipeline in HQ currencyDeals at transaction-date, average or closing rate.Weekly
  5. Approval lead timeDays from draft to final approval, per form and step.Monthly

Reports export to Excel or PDF and can be mailed to HQ on a schedule.

Notifications

Rules for what must not be missed

Web, push and mail alerts per type, plus reminders written for your own deadlines.

15 / 156alert rules that speak up before the deadline (example)
010203040506A circled date = one rule · it speaks up before the deadline
  1. 01 · day 7Approval waiting 24 h (example)

    Push to the approver, then a mail to the drafter’s manager.

    Push · mail
  2. 02 · day 13Contract ends in 30 days

    Owner and HR notified; renewal form pre-filled.

    Mail
  3. 03 · day 14Work permit nearing expiry

    HR and the expatriate’s manager alerted in that entity.

    Mail
  4. 04 · day 21Budget 90% used

    Cost-centre owner warned before the next request.

    Web · mail
  5. 05 · day 22Overtime near the monthly cap

    Employee and lead warned before the next request is approved.

    Push
  6. 06 · day 28Interface failed twice

    Admin alerted with the document number and the error.

    Mail
FAQ

NFFICE customization questions

How much can be changed without any development?

Organisation, roles, form fields, approval bands, holidays, notifications and branding are settings. In a typical fit-gap most requirements land there (example).

Our HQ runs SAP, Oracle or Dynamics. Can NFFICE talk to it?

Yes, through the ERP’s own APIs or an agreed file exchange. Which records and fields move is fixed in the interface spec after the fit-gap.

Can our paper forms keep their exact layout?

Fields and their order, yes. The printed PDF follows your layout and carries department and corporate seals.

Can staff sign in with our Entra ID?

Yes. Microsoft and Google sign-in are available, other providers join over SAML 2.0 or OpenID Connect, and IdP groups can map to NFFICE roles.

What happens when the ERP is down for maintenance?

Documents wait in NFFICE, retry automatically when the ERP is back and show on the status screen. Nothing is lost and nothing posts twice.

Which e-invoice provider do we use in Vietnam?

The one your entity already uses. NFFICE connects to it, so invoice templates, number series and the provider contract stay as they are.

Who updates a custom form when our regulations change?

Field and band changes are admin settings your team can make. A new calculation or approval step comes to us as a small change request, effective from the date you choose.

How is an integration tested before go-live?

Against the partner system’s test environment with cases from the spec: normal, duplicate, failure and month-end volume. Both owners sign off.

How are custom features priced?

Standard approval forms and report templates come with the subscription. Custom forms with embedded calculations and new integrations are quoted per item after the fit-gap.

Can a feature we ask for become part of the product?

If many customers need it, we propose it to the NFFICE product team. Once it ships as standard, your custom version can be retired.

Tell us what you
need built.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top