Each zone has its own entry, PPE and camera rules.
Cameras check the gear each zone asks for, not one rule for the whole plant.
Where people and trucks cross, the camera watches the gap between them.
OEE splits planned time into availability, performance and quality losses.
Availability × Performance × Quality
92 % × 95 % × 98 % = 85.7 % (example)
A hot spot is judged against a similar part under the same load, not one fixed number.
Possible deficiency — keep on the trend, recheck
Probable deficiency — repair at the next planned stop
Major — reduce load and repair now
Warning even below the limit — a fault still warming up (example)
Each failure mode shows first in a different signal, so sensors are chosen by mode.
Every alarm moves across the same board until the camera confirms the fix.
Motor M-07 bearing 9 °C above its sister motor (example)
Greased 41 days ago; its last two failures were bearings (example)
WO-2207 with snapshot, trend and a 6205 bearing from spare stock (example)
Repair set for the 14:00 planned stop; isolation needed
Closed with a photo; bearing back within 2 °C of its sister (example)
Mean time between failures: running hours ÷ failures, per asset.
Mean time to repair: from stop to restart, per failure.
Planned work hours ÷ all maintenance hours.
Gateways read the controllers and send events, not floods of raw values.
Before hands go into a machine, every energy source is isolated and proven dead.
List every energy source: electric, air, hydraulic, gravity, springs.
Tell the operators affected; the shift lead agrees the stop.
Normal stop from the HMI, not the emergency stop.
Breaker off, air valve closed, hydraulic pressure bled.
One personal lock per worker, a tag with name and date.
Block the raised ram, discharge capacitors.
Try to start; measure — zero energy confirmed.
Tools out, guards back; each lock removed by its owner only.
OSHA 29 CFR 1910.147 — control of hazardous energy
산업안전보건기준에 관한 규칙 제92조 — stop, lock and sign during maintenance
労働安全衛生規則 第107条 — stop, lock the starter, post a sign
Law on OSH 84/2015/QH13 — employer’s safe work procedures
The isolation checklist rides on the work order as a site form in NFFICE Groupware; the approval asks for it signed.
Gate times become shift hours, split by pay rate and checked against the caps.
One entry record flows into attendance, approvals and the pay-period close.
Live face check at the turnstile; snapshot on every in and out; unknown faces denied.
First-in and last-out become a shift day; normal, night and overtime hours split.
Overtime and leave approved by the line lead in KO, VI or EN.
Closed hours by pay rate, by Excel or API.
What is settled before the first face is enrolled and the first camera analysed.
What each country asks of a plant, and the equipment record that helps, lane by lane.
The lead of that zone on that shift, with a snapshot; the action taken is reported and approved in NFFICE.
No. IR windows fitted at a planned stop let cameras see the busbars with the door closed, which also keeps people outside the arc-flash boundary.
Yes. Existing sensors, PLC tags and historian data are read through a gateway and linked to the same asset in AI Ontology; nothing is replaced.
A person. AI Ontology drafts the work order with its evidence; the maintenance lead approves it in NFFICE before anything is scheduled.
Only for signals agreed in writing, such as a stop request, tested at a planned stop. Everything else is read-only.
The number of lanes is sized from peak arrivals per minute, measured in the survey, so hundreds of people can pass in a few minutes.
Yes. They are grouped by company, limited to their zones and hours, and their access ends on the permit expiry date.
You do, from your internal labour rules. NFFICE HR applies them per entity and warns before the legal caps are reached.
Another way of recording attendance is kept for them; data-protection rules expect consent to be freely given.
Analysis runs on an edge server on site; only events and snapshots reach NFFICE. Cloud storage is used only if agreed.