EN·VI·KO·JA Contact
Services / Development Biz / ODC (GDC) / Dedicated team (ODC)
[ ODC (GDC) · Dedicated team ]

Your own team,employed and seated by INFINIQ

A long-term team of INFINIQ employees works only on your product, from your backlog.
You pay a monthly fee per role; payroll, equipment, office and HR stay with INFINIQ.

01Roles

What each role hands to the next

A role is defined by what it delivers, so gaps show up before the team starts.

One team, seven roleseach role is defined by what it hands on
7roles
PO
Product owner (yours)→Ordered backlog and sprint goal
BA
Business analyst→Stories with acceptance criteria
UX
UI/UX designerfrom 0.5 FTE (example)→Wireframes and a UI kit
DEV
Developers→Reviewed code with unit tests
QA
QA engineer→Test report and regression suite
OPS
DevOps engineerfrom 0.5 FTE (example)→Pipeline, environments, monitoring
PM
PM / Scrum Master→Sprint report and risk list
  • Designer and DevOps often start at 0.5 and grow with the product (example).
02Backlog item

Anatomy of one ready story

An item enters a sprint only when it meets the Definition of Ready agreed with the PO.

points
story
acceptance
done
ORD-2125 story points (example)

As a store manager in Osaka, I want today’s orders as a CSV file, so that I can send them to the warehouse.

  • AC1Given orders today, when I export, then the file lists each order once.
  • AC2Given no orders, when I export, then I see an empty-file message.
  • AC3Amounts use the store’s currency, yen.
DEFINITION OF DONE
Code reviewedTests passOn stagingAccepted by the PO
READY
DEFINITION OF READYCriteria writtenDesign attachedDependencies clearedEstimated by the team
ORD-2125 pt
  • (INT)Scrum Guide 2020: the Product Owner is accountable for ordering the backlog.
  • Weekly status report in Korean, English, Japanese or Vietnamese (example).
03First sprints

How velocity settles over six sprints

Early sprints are slower while the team learns the domain, so plans use a range.

Story points done per sprintStory points done per two-week sprint (example).
settles near 38 (example)
forecast range
SPRINTS1 · 18 ptS2 · 24 ptS3 · 31 ptS4 · 35 ptS5 · 37 ptS6 · 38 pt
  • The forecast uses the average of the last three sprints (example).
  • Velocity compares a team with itself, never with another team.
  • Ramp-up length depends on domain and codebase size.
04Monthly statement

A monthly statement, line by line

The statement lists each role, its FTE and its rate; included services show at zero.

Monthly statementStatement for October 2026, 8.0 FTE (example)
ROLEFTERATE
Tech lead1.0Rate A
Backend developer3.0Rate B
Frontend developer2.0Rate B
QA engineer1.0Rate C
DevOps engineer0.5Rate D
UI/UX designer0.5Rate E
INCLUDED IN THE RATEEquipment0Office seat0HR and recruiting0Account management0
BILLED AT COSTLicences you requestat costTravelat cost
Total FTE0.01.04.06.07.07.58.0
  • A vacant seat is not billed (example).
  • Leave is covered by the named backup, with no extra line.
05Secure area

Open paths and closed paths

Only routes through your accounts and the VPN are open; the rest is closed by default.

your repository
×
×
×
×
test environment
PATHS FROM THE TEAM ROOMdefault: closed
1Managed laptop → VPN with MFA → your repositoryopen
2Laptop → personal cloud driveblocked
3Laptop → USB storageblocked
4Visitor → team room without escortblocked
5Team room → other customers’ screensblocked
6Production data → test, masked onlyopen
LAWS BY COUNTRY
  • (VN)Law on Cybersecurity 116/2025/QH15, in force 1 Jul 2026.
  • (KR)Personal Information Protection Act Art. 28-8: transfer abroad needs a legal basis such as consent or a contract.
  • (JP)APPI Art. 28: providing data to a third party abroad needs consent or an equivalent system.
  • (US)State privacy laws such as CCPA require a written service-provider contract.
06Knowledge retention

Knowledge kept where you own it

Documents live in your wiki and repository; each shelf has an owner and a backup.

01Architecture decision recordsownerTech leadbackupSenior developer
02Runbooks and on-call notesownerDevOpsawaybackupDeveloper
03Domain glossaryownerBAbackupPM
04Test suites and test dataownerQAbackupDeveloper
05Onboarding guideownerPMbackupBA
06Release notesownerPMbackupQA
2people or more

Every critical area has at least two people who can work on it, reviewed each quarter (example).

  • A leaver’s handover checklist is signed by the backup, not by the leaver.
07Build · operate · transfer

BOT in three phases, offered by INFINIQ

The transfer conditions go into the first contract, not into a negotiation at the end.

BBuild3–6 months (example)
OOperate1–3 years (example)
TTransfer3–6 months (example)
phase nowBuildOperateTransfer
BBuild3–6 months (example)

Hiring, office, tools and processes set up for your team

OOperate1–3 years (example)

INFINIQ employs and runs the team; your PO directs the work

TTransfer3–6 months (example)

Your entity is ready; people, equipment and office move

  • (VN)Law on Investment 2025 (Law 143/2025/QH15), in force 1 Mar 2026, lets a foreign investor set up the company before the investment certificate in eligible cases.
  • The transfer fee rule is agreed at signing, so the cost of moving is known from the start.
FAQ

Dedicated team questions

Do we need our own product owner?

It works best that way. If not, INFINIQ’s BA can act as a proxy PO, with your weekly sign-off on priorities (example).

How do we see progress between sprints?

Through the board in your own tool, a weekly status report and the demo at each sprint review.

Who owns the code and the documents?

You do, from the first day: repositories and the wiki sit in accounts your company controls.

When can a BOT transfer happen?

After the operate phase, once the conditions written into the first contract are met and your entity is ready to employ the team.

How is production data protected?

Test environments use masked data; production access goes only through accounts you issue, with your approval.

Can team members visit our office?

Yes. A visit at the start, for example to Seoul, Tokyo or Frankfurt, helps the domain walkthrough; travel is billed at cost.

Does the team follow our tools and process?

Yes. The team works in your tracker, repository and chat, and adapts its Scrum events to your calendar.

Tell us what you
need built.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top