EN·VI·KO·JA Contact
Services / Development Biz / IT Infra
[ IT Infra · Site networks and the cloud move ]

Two anchorsat every point

Offices, plants and warehouses wired to HQ and the cloud, with a second path everywhere.
Servers are listed and labelled first, then moved to the cloud in rehearsed waves.

Site assessment

A site walk before the route is drawn

Rooms, cable paths, power and existing lines, checked the way we survey before installing our own devices.

Cabinet → bench≈ 62 m copper · within 90 m(example)
1
2
3
4
5
6
7
Site survey · the existing rack and lines checked with a tester before anything goes in
Survey points · site walk7 points
  1. 1
    Floors & users

    Desks, scanners, cameras and machines per area

  2. 2
    Internet lines

    Carriers, speeds, contracts and where each line enters

  3. 3
    Server room or rack

    Power, cooling, UPS runtime, locks

  4. 4
    Cable paths

    Distances against the 100 m copper limit; fibre between buildings

  5. 5
    Radio conditions

    Steel racks, forklifts, neighbouring networks

  6. 6
    Plant systems

    PLCs, scanners and cameras that must stay reachable

  7. 7
    Bandwidth per stream

    Camera and video load, as in our own device installs

Network design

Core, distribution, access and VLANs

A layered design with one VLAN per use, so a camera, a guest and the finance PC never share a segment.

Switch stack ×4= the core, one management IP
Uplinks = trunkone cable pair, 802.1Q tags
VLAN 10 · staff
VLAN 20 · finance
VLAN 40 · cameras
VLAN 99 · admin
One switch stack: each port group is a VLAN, the uplinks carry them all
Corestacked pair, two fibre uplinks per building
Distributionone pair per building
Accessone per floor, PoE for cameras and APs
OT only
VLAN 10Staff

Office apps, internet through the firewall

VLAN 20Finance & ERP

Only to the ERP and HQ finance systems

VLAN 30Voice

Priority queue end to end

VLAN 40Cameras & IoT

PoE ports; reaches the video server only

VLAN 50Plant (OT)

Own firewall zone, IEC 62443 zones and conduits

VLAN 60Guests

Internet only, time-limited

VLAN 99Management

Switches and firewalls, admins only

IP plan line (example)10.42.0.0/16 · Asagiri Denko, Bac Ninh plant10.42.40.0/22 cameras · 10.42.50.0/24 plant machinesNo overlap with Nagoya HQ 10.10.0.0/16 or the cloud 10.80.0.0/14
Wi-Fi survey

Wi-Fi measured, not guessed

Measured three times: a predictive model, an on-site survey with a test access point, and a check after install.

−67 dBm edge (example)
AP-2F-07Ceiling, under the cable tray
Chalk rings · measured coverage, overlapping with a margin
  1. Pass 1Predictive model

    Walls, racks and steel drawn into a planning tool

  2. Pass 2AP-on-a-stick survey

    A test access point at the real mounting height

  3. Pass 3Validation

    A heat map after install, kept with the as-built pack

Chalk marks on every pass
  • Targets

    −67 dBm for voice and handheld scanners (example)

  • Roaming

    Scanners on forklifts hand over between access points without drops

  • Security

    WPA3-Enterprise with 802.1X for staff; guest network apart

Structured cabling & racks

Cables and racks you can trace

Every cable labelled at both ends, tested and recorded, following TIA-568 and ISO/IEC 11801.

permanent link ≤ 90 m
channel with patch cords ≤ 100 m
tester
Cat 6A · 87.4 m · PASS (example)
Rack endB3-02-14rack–panel–port
Desk end2F-114outlet, same label
Rack elevation · B3
PDU A
U14–13Patch panels
U12Cable manager
U11–10Switch stack
U9–8Firewall pair
U7–4Servers
U3–1UPS
PDU B
  1. T1
    Horizontal copper

    Cat 6A to each outlet, permanent link within 90 m

  2. T2
    Backbone

    Fibre between floors and buildings, two paths where possible

  3. T3
    Labels

    Rack–panel–port on both ends and in the cable schedule

  4. T4
    Certification

    A test report for every link, pass or fail

  5. T5
    Rack layout

    Patch, switch, firewall, servers, UPS — in that order

  6. T6
    Power & room

    Dual PDUs, UPS, temperature and door sensors

B3-02-14
Labelled at both endsthe same code on the rack and at the outlet
A numbered fibre patch panel
SD-WAN & VPN to HQ

Fixed lines from the site to HQ and cloud

Two carriers on different paths, SD-WAN choosing the better link per application, encrypted tunnels to HQ and cloud.

SD-WANedge router
Out of the routerIPsec to HQ · VPN or private link to cloud
Line Acarrier A · fibrecut
Line Bcarrier B · other path
WAN · A / BHP-WAN-01
Two fibre pairs, two carriers: traffic rides whichever is up
Rope inventory · site to HQ and cloud
  1. A
    Primary line

    Business fibre from carrier A

  2. B
    Second line

    Carrier B entering the building by another path

  3. 4G
    Last resort

    4G/5G modem on the firewall

  4. HQ
    Tunnels to HQ

    IPsec to Seoul, Nagoya, Stuttgart or Portland

  5. CL
    Cloud link

    VPN, or a private link such as Direct Connect or ExpressRoute

  6. QoS
    Application policy

    ERP and voice first; backups and updates at night

Round-trip times from the site (example)From the Hai Phong site · one rope per destination, cut to its round trip
Seoul
48 ms
Tokyo
62 ms
Oregon
190 ms
Frankfurt
210 ms
050100150200

Measured on both lines; subsea cable faults planned for

Firewalls & network access

The belay point: firewalls and access

Next-generation firewalls between zones, devices admitted by identity, remote access without exposing servers.

Firewall A · activeFirewall pair

Fortinet or pfSense class, in HA at each site

Firewall B · standby

same model, same rules, synced

Zone rules

Deny by default between VLANs; every allow is logged

Inspection

IPS and web filtering on internet traffic

Port access

802.1X; unknown devices land in the guest VLAN

Remote access

Zero-trust access or VPN, always with MFA

locked
Firewall · active unitevery packet between zones is inspected
One firewall rule (example)ALLOW VLAN 20 Finance → HQ ERP 10.10.8.20:443Owner: finance lead, Bac Ninh · review March 2027
Rule review

Each rule has an owner and a review date

Redundancy & failover

No single point holds the whole rope

Lines, firewalls, core switches, power and servers are paired, and each failover is tested by pulling the plug.

Uplink 1
Uplink 2
Two uplinks: pull one and the other carries the traffic
Pull-test bench · one anchor pulled per pair1 pulled → 2 keeps the load
InternetTwo carriers

Primary unplugged; ERP session stays open

✓ held
FirewallHA pair

Active unit rebooted; switch under 5 s (example)

✓ held
Core switchStack with dual uplinks

One member powered off

✓ held
PowerDual supplies, UPS, generator

Mains cut for 20 minutes (example)

✓ held
ServersTwo hosts, replicated storage

One host drained during work hours

✓ held
DNS & DHCPTwo servers

One stopped; new devices still get addresses

✓ held
Migration assessment

An inventory before the first box

Discovery tools and interviews show what runs, who uses it and what it talks to (proposal: 2–4 weeks).

✓
✓
✓
LOT 07HP-ERP-DB01
Scanned → listed
One inventory line (example)
  1. HP-ERP-DB01 · Hanul Precision, Hai Phong plant server room
  2. Windows Server 2016 · SQL Server 2016 · 1.2 TB · +18 GB per month
  3. Called by: MES, label printers, HQ report job (Changwon, 02:00 KST)
Every unit scanned and listed, one row each
Inventory sheet · lot tagsDiscovery tools + interviews
Tag roll
08091011121314
  1. 01Servers & VMs

    CPU, memory, disk, OS version and 30 days of real use

    ✓
  2. 02Databases

    Engine, version, size, growth per month, licence

    ✓
  3. 03Dependencies

    Who calls whom, on which port, from network flow data

    ✓
  4. 04Files & backups

    Shares, archives and where today’s backups really go

    ✓
  5. 05Licences

    Windows Server, SQL Server, Oracle: bring your own or included

    ✓
  6. 06End-of-support dates

    e.g. Windows Server 2016 extended support ends 12 Jan 2027

    ✓
  7. 07Owners & quiet hours

    Who signs off each system and when it may stop

    ✓
Migration waves

Moving in waves, each one rehearsed

Systems that talk to each other move together; every wave is rehearsed on a copy before the real night.

rehearsal on a copythe real move
  1. Wave 0 · pilot

    A low-risk internal tool proves the landing zone

    Weeks 1–2 (example)
  2. Wave 1 · files & tools

    File shares, print and license servers

    Weeks 3–5 (example)
  3. Wave 2 · business apps

    Each app with its database in one dependency group

    Weeks 6–10 (example)
  4. Wave 3 · finance-critical

    ERP-side systems, never in the last five days of a month

    Weeks 11–14 (example)
  5. Close-out

    Retain and retire lists closed, old racks emptied

    Weeks 15–16 (example)
TripW2
Wave 2 rehearsal (example)
  1. Final data sync 3 h 10 min · 42 of 42 application checks passed
  2. Window Sat 22:00–Sun 06:00 ICT = Sun 00:00–08:00 KST
  3. Decision: go · DNS TTL lowered to 5 minutes two days before
Wave 3 · finance-criticalMonth-end freeze
2425262728293031
Units that talk to each other move together, one dolly at a time
Cut-over & rollback

Moving night, hour by hour

A cut-over runbook with named owners, check points and the hour after which we no longer roll back.

Old siteStill running
Old siteRead-only
Cut-over desk · nightOne owner reads the runbook out, step by step
Cut-over runbookOwner, check point and initials on every strip
T−48 h

Change freeze; DNS time-to-live lowered

✓
T−0

Writes stopped; final replication run

✓
T+1 h

DNS and connection strings switched

✓
T+2 h

Users in Changwon and Hai Phong run their test list

✓
T+4 h

Point of no return: go, or roll back to the old servers

✓
T+14 d

Old servers kept read-only, then retired (example)

✓
Hand-over

The new house, handed over with its manuals

What you hold at the end: code, diagrams, runbooks, monitoring and the first cost report.

01
02
03
04
05
06
07
Diagrams, runbooks and the access list in one binder
Welcome binder · hand-over7 dividers
  1. Landing-zone design

    Accounts, networks, identity and guardrails

    01
  2. Code repositories

    Terraform and Ansible in your own Git organisation

    02
  3. Network diagram & IP plan

    Sites, VLANs, VPNs and firewall rules

    03
  4. Runbooks

    Restart, restore, scale and rotate secrets

    04
  5. Monitoring

    Dashboards and alert routes with named owners

    05
  6. Backup & DR plan

    RPO / RTO per system and a tested restore

    06
  7. Cost report

    Tag dictionary, monthly trend and next savings

    07
Access listNamed owners for every admin role
In place of keys
FAQ

IT Infra questions

Can you work in a running plant without stopping production?

Yes. Changes go into night or weekend windows agreed with plant engineering, and new switches run in parallel before the old ones are removed.

Do we need SD-WAN, or are VPNs enough?

One or two sites often do well with VPNs. With more sites, voice and cloud applications, SD-WAN pays back through path choice and central policy.

How do we keep plant machines safe from office threats?

Plant systems sit in their own zone behind a firewall, following IEC 62443 zones and conduits, with only the flows the plant needs.

What happens when international internet slows down?

Subsea cable faults affect Vietnam several times a year. Critical systems get a second path, a nearby cloud region and local copies where it matters.

How long does a migration take?

It depends on the number of systems and their links. A pilot wave takes weeks; 50–100 servers often take three to six months (example).

Will our users notice the move?

Mostly not. Data is replicated in advance and each wave switches in a weekend window agreed with HQ and the plants.

AWS, Azure, Google Cloud, Naver Cloud or Viettel Cloud?

We compare the HQ standard, data-location rules, the services you need, local support and cost. The landing-zone design works on each.

Can some data stay in Vietnam while the rest moves?

Yes. Workloads covered by Vietnamese rules can run in a cloud or data centre in Vietnam, and the rest in Seoul, Tokyo, Frankfurt or US regions, under one landing zone.

What if something goes wrong on cut-over night?

Until the agreed point of no return we can switch back to the old servers, which stay untouched and read-only afterwards for a fixed period.

Who owns the equipment and licences?

Your company. Devices and subscriptions are registered in your name, and renewal dates are in the inventory you receive.

Tell us what you
need built.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top