Rooms, cable paths, power and existing lines, checked the way we survey before installing our own devices.
Desks, scanners, cameras and machines per area
Carriers, speeds, contracts and where each line enters
Power, cooling, UPS runtime, locks
Distances against the 100 m copper limit; fibre between buildings
Steel racks, forklifts, neighbouring networks
PLCs, scanners and cameras that must stay reachable
Camera and video load, as in our own device installs
A layered design with one VLAN per use, so a camera, a guest and the finance PC never share a segment.
Office apps, internet through the firewall
Only to the ERP and HQ finance systems
Priority queue end to end
PoE ports; reaches the video server only
Own firewall zone, IEC 62443 zones and conduits
Internet only, time-limited
Switches and firewalls, admins only
Measured three times: a predictive model, an on-site survey with a test access point, and a check after install.
Walls, racks and steel drawn into a planning tool
A test access point at the real mounting height
A heat map after install, kept with the as-built pack
−67 dBm for voice and handheld scanners (example)
Scanners on forklifts hand over between access points without drops
WPA3-Enterprise with 802.1X for staff; guest network apart
Every cable labelled at both ends, tested and recorded, following TIA-568 and ISO/IEC 11801.
Cat 6A to each outlet, permanent link within 90 m
Fibre between floors and buildings, two paths where possible
Rack–panel–port on both ends and in the cable schedule
A test report for every link, pass or fail
Patch, switch, firewall, servers, UPS — in that order
Dual PDUs, UPS, temperature and door sensors
Two carriers on different paths, SD-WAN choosing the better link per application, encrypted tunnels to HQ and cloud.
Business fibre from carrier A
Carrier B entering the building by another path
4G/5G modem on the firewall
IPsec to Seoul, Nagoya, Stuttgart or Portland
VPN, or a private link such as Direct Connect or ExpressRoute
ERP and voice first; backups and updates at night
Measured on both lines; subsea cable faults planned for
Next-generation firewalls between zones, devices admitted by identity, remote access without exposing servers.
Fortinet or pfSense class, in HA at each site
same model, same rules, synced
Deny by default between VLANs; every allow is logged
IPS and web filtering on internet traffic
802.1X; unknown devices land in the guest VLAN
Zero-trust access or VPN, always with MFA
Each rule has an owner and a review date
Lines, firewalls, core switches, power and servers are paired, and each failover is tested by pulling the plug.
Primary unplugged; ERP session stays open
✓ heldActive unit rebooted; switch under 5 s (example)
✓ heldOne member powered off
✓ heldMains cut for 20 minutes (example)
✓ heldOne host drained during work hours
✓ heldOne stopped; new devices still get addresses
✓ heldDiscovery tools and interviews show what runs, who uses it and what it talks to (proposal: 2–4 weeks).
CPU, memory, disk, OS version and 30 days of real use
✓Engine, version, size, growth per month, licence
✓Who calls whom, on which port, from network flow data
✓Shares, archives and where today’s backups really go
✓Windows Server, SQL Server, Oracle: bring your own or included
✓e.g. Windows Server 2016 extended support ends 12 Jan 2027
✓Who signs off each system and when it may stop
✓Systems that talk to each other move together; every wave is rehearsed on a copy before the real night.
A low-risk internal tool proves the landing zone
Weeks 1–2 (example)File shares, print and license servers
Weeks 3–5 (example)Each app with its database in one dependency group
Weeks 6–10 (example)ERP-side systems, never in the last five days of a month
Weeks 11–14 (example)Retain and retire lists closed, old racks emptied
Weeks 15–16 (example)A cut-over runbook with named owners, check points and the hour after which we no longer roll back.
Change freeze; DNS time-to-live lowered
✓Writes stopped; final replication run
✓DNS and connection strings switched
✓Users in Changwon and Hai Phong run their test list
✓Point of no return: go, or roll back to the old servers
✓Old servers kept read-only, then retired (example)
✓What you hold at the end: code, diagrams, runbooks, monitoring and the first cost report.
Accounts, networks, identity and guardrails
Terraform and Ansible in your own Git organisation
Sites, VLANs, VPNs and firewall rules
Restart, restore, scale and rotate secrets
Dashboards and alert routes with named owners
RPO / RTO per system and a tested restore
Tag dictionary, monthly trend and next savings
Yes. Changes go into night or weekend windows agreed with plant engineering, and new switches run in parallel before the old ones are removed.
One or two sites often do well with VPNs. With more sites, voice and cloud applications, SD-WAN pays back through path choice and central policy.
Plant systems sit in their own zone behind a firewall, following IEC 62443 zones and conduits, with only the flows the plant needs.
Subsea cable faults affect Vietnam several times a year. Critical systems get a second path, a nearby cloud region and local copies where it matters.
It depends on the number of systems and their links. A pilot wave takes weeks; 50–100 servers often take three to six months (example).
Mostly not. Data is replicated in advance and each wave switches in a weekend window agreed with HQ and the plants.
We compare the HQ standard, data-location rules, the services you need, local support and cost. The landing-zone design works on each.
Yes. Workloads covered by Vietnamese rules can run in a cloud or data centre in Vietnam, and the rest in Seoul, Tokyo, Frankfurt or US regions, under one landing zone.
Until the agreed point of no return we can switch back to the old servers, which stay untouched and read-only afterwards for a fixed period.
Your company. Devices and subscriptions are registered in your name, and renewal dates are in the inventory you receive.