Systems we built pass it at handover; systems built elsewhere pass it during transition.
Every runtime, framework, OS and database, with its end-of-support date.
Dependency scan against known CVEs and the CISA KEV list.
Reproducible from a clean checkout in CI.
Which key flows are covered before anything is changed.
Scripted or manual, rollback possible or not.
Test and production built the same way; settings kept in code.
The backlog sorted into defects, changes and debt.
Every channel lands in one queue with the same ticket number and the same clock.
A form per request type; matching help articles appear while typing.
Each message becomes a ticket; replies stay on the same thread.
Teams or Slack, and KakaoTalk, LINE or Zalo where agreed.
A hotline for P1 incidents (example).
Alerts open tickets on their own, before users call.
An IT request form inside groupware, routed straight to the desk.
Korean, Vietnamese, English and Japanese, with hours set around your offices (example).
Hanoi 07:00–18:00 = Seoul 09:00–20:00 (example)
Local entity and plant shifts, 07:00–22:00 (example)
European mornings from the Hanoi afternoon; US by on-call or next morning
The same window for Tokyo and Osaka (example)
P1 phone line to the on-call engineer
Holiday rota for Tết, Chuseok, Golden Week and Christmas (example)
Sorting at the desk decides the clock, the team and the line it appears on in the report.
Approval screen slow since 08:00
New user for the night shift
How do I export the monthly report?
Add a VAT field to the order form
Password reset
Payment batch failed
Something is broken or slower than normal.
ClockPriority P1–P4New user, access, password reset, data export.
ClockCatalogue time per item“How do I…?” answered from the knowledge base.
ClockSame business dayA new field, report or rule: goes to the change backlog.
ClockEstimate within 5 daysHours, response and resolution chosen per system; values are examples to start from.
A lit ring answers at this hour.
Internal tools, one entity
ERP and groupware across entities
Customer-facing shops, plants on night shift
Response = first reply from a person, not an auto-reply
Clock paused while waiting for your information
Missed targets reported with cause; service credits as agreed
Standard, normal and emergency changes follow different paths (ITIL 4 change enablement).
Pre-approved and low risk: a new report filter, a user role. Done within the week.
Impact, effort, test and rollback assessed; your product owner approves; next release.
A fix for a P1 or an exploited flaw; fast approval, reviewed afterwards.
Password resets and data exports go to the service desk as requests.
Corrective, adaptive, perfective and preventive work, as in ISO/IEC 14764
Releases on fixed slots, away from closing days and seasonal peaks, with a rollback ready.
Second Tuesday, 21:00 local time of the main entity (example).
Month-end close, year-end, Tết, Chuseok, Golden Week and Christmas peaks.
Any day, for P1 fixes and critical patches only.
Expand, migrate, contract: old and new code both work during the switch.
Expand→Migrate→ContractWritten for users in KO · VI · EN · JA, not as a commit list.
KOVIENJACVSS score, active exploitation and exposure decide how fast a patch goes out (example).
Emergency change; firewall rule or feature off first
Hotfix lane with regression tests
Next monthly release
Bundled with planned upgrades
A register of every runtime, OS and database with its vendor end-of-support date (as of Oct 2026).
.NET 10 LTS
PostgreSQL 17 or 18
Next 4.x line; 3.5 open-source support ended Jun 2026
Windows Server 2022 or 2025, or Linux
Node.js 24 LTS
Ubuntu 24.04, or paid ESM to 2032
SQL Server 2022
Java 21 or 25 LTS
SQL Server 2016 (14 Jul 2026) · Node.js 20 (30 Apr 2026)
Python 3.10 (Oct 2026) · CentOS 7 (30 Jun 2024)
Options: upgrade, paid extended support, or isolate and plan the exit
Small steps with tests in between, so users notice nothing except fewer problems.
Libraries, plugins and their compatibility with the target version.
Tests that pin today’s behaviour on key flows; QA Biz regression for big jumps.
Spring Boot 2.7 → 3.x needs Java 17 and the jakarta.* namespace; .NET 6 → 8 → 10.
OpenRewrite recipes and the .NET Upgrade Assistant do the mechanical part.
The new build takes a share of traffic before it takes all of it.
Deprecated settings and compatibility shims removed.
Rotterdam · Austin · built by another vendor in 2020
Spring Boot 2.7 / Java 11 → 3.5 / Java 21 in three monthly releases
No user-visible change; startup time 48 s → 19 s (example)
Measure, find the bottleneck, fix the biggest one, measure again.
14 min, timing out for the Hanoi entity
Two indexes added, one query rewritten
90 s, no new servers (example)
Languages, frameworks, data, cloud and operations tools across our nine Development areas.
LTS lines only; move within six months of a new LTS (example)
Two latest majors supported; design tokens versioned with the code
Major upgrade planned a year before end of support
Versioned interface contracts; old versions retired on a notice period
Changes kept outside the core so platform updates stay safe
Model and runtime versions pinned per site, upgraded with a test set
Signed firmware, staged roll-out, one version per site on record
Infrastructure as code; Kubernetes minors kept inside their 14-month support
One toolchain per customer, or we work inside yours
Like an operations status board, every ticket shows its state, owner and time left.
Not yet sorted; the desk owns it.
Assigned to a named engineer.
Clock paused; reminder after two business days (example).
Case number from SAP, the cloud or the payment provider attached.
User confirms, or it closes itself after three days (example).
Less than 20 % of the clock left: highlighted for the team lead.
One report per month in your language, read together in a 60-minute review (example).
By priority and by entity: Seoul HQ, Hai Phong plant, Osaka branch.
97 %✓Tickets by category and channel, compared with the last three months.
412✓Top five causes and the problem records behind them.
Top 5✓One-question survey after each ticket, with comments.
4.6 / 5✓What to automate, document or change next month.
next month✓Top repeat: VPN on the Hai Phong night shift → knowledge article and fix
Decision: add a Japanese-speaking slot for the Osaka branch
Yes. Each user is answered in the language they wrote in: Korean, Vietnamese, English or Japanese.
Yes, after a knowledge transfer. Where the original vendor keeps code fixes, we stay the single contact and chase them.
From a monthly bank of hours (example). Anything larger than about 40 hours (example) gets its own estimate or becomes a project.
Your change authority, usually the product owner. Standard changes are approved once as a list and then simply logged.
If it is being exploited, we mitigate the same day and patch within 72 hours (example), as an emergency change.
It depends on exposure. We set out three options — upgrade, paid extended support, or isolate and plan the exit — with cost and risk.
The aim is no visible change. Where something must change, release notes explain it in each user language first.
Each miss is reported with its cause and fix in the monthly report, and service credits apply as agreed.
Yes. We work inside ServiceNow, Zendesk or Jira if you have one, or provide Jira Service Management.
A ticket export, users per entity, a key user in each site, admin access and the contacts of your vendors.