EN·VI·KO·JA Contact
Solutions / NFFICE / Finance / Budget & costs
[ NFFICE Finance · Budget & costs ]

Know the budgetbefore you spend it.

The remaining budget appears while you draft, and costs are split by department, type and site
— warnings come before the money goes.

Feature 1/ 5Budget check

The budget, on the draft.

While a purchase request or expense is being drafted, it is checked against every budget it uses — the department’s month, its year, the project and the cost type.
Crossing the 90% line shows a warning before sending, asks for a reason and adds an approver; the check is saved with the request.

  1. Four budgets at once

    One draft is checked against the department month, the year, the project and the cost type, each shown as a gauge.

  2. Committed counts too

    Executed costs, open purchase orders and this draft are all deducted before the remaining budget is shown.

  3. Warning before sending

    Past 90%, the draft turns amber, a reason is required and the entity director joins the approval line.

  4. Amounts before VAT

    Deductible input VAT is kept out, so the budget is used by the cost amount only.

This request against its budgets · PR-2611-0318
93%Production · November
418.5M₫/ 450M₫
Over 90% · reason needed
79%Production · 2026
3.79B₫/ 4.80B₫
1.01B₫ left
70%Project PRJ-BN-03
1.26B₫/ 1.80B₫
Bac Ninh line 2
82%Repairs & maintenance
214M₫/ 260M₫
46M₫ left this year
Purchase request · PR-2611-0318Conveyor spare parts · Ngõ Trúc Supplies · 42,000,000₫
DepartmentProduction · CC-BN
Cost typeRepairs & maintenance
ProjectPRJ-BN-03
Amount42.0M₫ excl. VAT
Drafted byPhạm Quốc Anh
ApproversLead → finance → director

Over the 90% lineThe request can still be sent, but a reason is required, every approver sees the warning, and the entity director is added to the line. Past 100% it waits for a budget transfer. The line and actions are set by your company (sample values).

At a glance
01Budgets checkedMonthyearprojecttype
02Warning line90% (set by company)
03DeductedExecuted + committed
04Over the lineReasonextra approver
Feature 2/ 5Cost catalog

One list of cost types for everyone.

Finance keeps one catalog of cost types — 76 today, in 9 groups — and every claim, purchase request and report picks from it.
Each entry carries its account, VAT treatment, required evidence and whether it is deductible, so staff choose a plain name and the accounting follows.

CT-0412Active · v3
Taxi and ride-hailing
GroupTransport · travel
Account6427 · outside services
VAT8% · deductible
EvidenceE-invoice · from / to
DeductibleYes · valid invoice
Budget lineDepartment travel
Approved by finance · 04/11
Finance team · catalog ownerNguyễn Thị Lan keeps one list · 76 cost types, each mapped once
Cost types in the catalog76

9 groups · 3 added this year by approval

Most-used types · November
Taxi412 lines
Meals305 lines
Fuel214 lines
Supplies128 lines
What every entry defines · 6
  • ✓Account code
  • ✓VAT treatment
  • ✓Evidence required
  • ✓Fields asked on the claim
  • ✓Budget line it uses
  • !Not deductible — warned
01One catalog, every form

Expense claims, purchase requests, budgets and cost reports all read the same 76 types.

02Account set once

Each type is mapped to its account (e.g. taxi → 6427, sample); staff never see a code.

03Tax and evidence per type

VAT treatment, required evidence and deductibility are part of the entry and are applied on every claim.

04Changes through approval

New or changed types go through approval, are versioned, and retired types stay in history.

At a glance
01Cost types76 in 9 groups
02Used byClaimsrequestsreports
03Per entryAccountVATevidence
04ChangesApproved and versioned
Feature 3/ 5Cost reports

Costs by department, type and period.

Every approved claim, invoice and allocation lands in one cost table, totalled by department, cost type, site and period.
Month-on-month changes are shown as a bridge, each step opens to the vouchers behind it, and the same view exports to Excel for the HQ pack.

October → November · all departments · million ₫
410
October
+118
Materials
+46
Outsourcing
−24
Transport
−18
Office
532
November

Each step opens to its vouchers · sample figures

Report filtersCost by type · Nov vs Oct 2026
EntitySample Co. Vina · VND
DepartmentAll · 4 departments
Cost type5 groups · 76 types
Period01–30/11 vs October
Change+122M₫ · +29.8%
ExportExcel · with voucher lines
EXCEL · exported 01/12 08:15
01Totals without a spreadsheet

Costs are totalled live by department, type, site and period from approved documents.

02Why it changed

The bridge splits the change by cost type — materials +118M₫ for line 2 start-up, outsourcing +46M₫.

03Down to the voucher

Each bar opens the claims, invoices and journal lines that make it up.

04Excel for HQ

Filters are kept with the export, and amounts can be shown in VND or USD at the month’s rate.

At a glance
01ViewsDepartmenttypesiteperiod
02CompareLast monthlast year
03Drill-downTo the voucher
04ExportExcelVND or KRW
Feature 4/ 5Budget planning

Budgets set once, followed all year.

Each department enters its annual budget by month and cost type, and the entity budget is approved once in January.
From then on every claim and purchase order is deducted as executed or committed, and any transfer between departments goes through approval and is kept as a version.

Budget 2026 · 12.0B₫Departments · 4Status at 31/10
Approved in Jan11.40B₫ · 13/01/2026
Changes approved+0.60B₫ · 3 transfers
Production4.80B₫ · 78% used
Sales2.60B₫ · 89% · ahead
Admin2.20B₫ · 74% used
Projects · sites2.40B₫ · 66% used
Executed9.25B₫ · 77%
Committed1.18B₫ · open POs
Remaining1.57B₫ · 13%
12.0B₫Budget 2026 · Hanoi entity
77%Executed · 83% of the year gone
89%Sales · ahead of pace
0.60B₫Changed by approval · 3 transfers
01Entered by month and type

Departments plan by month and cost type from the same catalog, so the budget and the actuals line up.

02Executed, committed, remaining

Spend is split into executed, committed (open purchase orders) and remaining, updated with every approval.

03Ahead of pace

Execution is compared with the share of the year gone; Sales at 89% against 83% is flagged.

04Transfers by approval

Transfers and increases go through Groupware approval; the January budget and each change stay as versions.

At a glance
01GranularityDepartmentmonthtype
02StatusExecutedcommittedleft
03Pace checkvs share of year gone
04ChangesApprovalversioned
Feature 5/ 5Cost allocation by site

Costs split by project and site.

Costs that serve several sites — safety supervision, rent, shared IT — are first booked to a shared pool, then split at month-end by a rule finance sets: headcount, floor area or revenue.
The allocation entry is proposed with every cost centre’s share, and each site’s cost appears in construction site management.

HSE supervision · 3 locations
Shared cost to allocateMinh Phát · HSE service · November
InvoiceC26TMP · 00457
Supply value186,000,000₫
VAT 10%18,600,000₫ · 1331
Booked toShared pool CC-POOL
RuleHeadcount · 200
PeriodNovember 2026
Split by headcount on 30/11
Allocation entry · proposed at month-endJV-2611-0412
30/11 · VND
Debit · cost centres
154Construction in progress · CC-LB Long Bien site85,560,000
6278Plant overhead · CC-BN Bac Ninh plant57,660,000
6427G&A outside services · CC-HO head office42,780,000
Credit · shared pool
6278Shared HSE cost pool · CC-POOL (cleared)186,000,000
RuleHeadcount on 30/11 · 200
Long Bien site92 people · 46%
Bac Ninh plant62 people · 31%
Head office46 people · 23%
AccountsTT99 sample accounts
Shown inSite management · per site
Debit · cost centres186,000,000₫
Debit = credit ✓
Credit · shared pool186,000,000₫
01Cost centres per site

Each project and site is a cost centre (CC-LB, CC-BN, CC-HO), picked on every claim and order.

02Shared costs by rule

Headcount, floor area or revenue is set once per cost pool; percentages are recalculated from the month-end figures.

03Allocation entry proposed

Debits per cost centre and the credit to the shared pool are proposed together and always balance.

04Linked to site management

Each site’s share shows in construction site management next to its direct costs.

At a glance
01Cost centresProjectsiteoffice
02RulesHeadcountarearevenue
03RunMonth-end, proposed
04Linked toConstruction site management

Close a month
with your own books.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top