EN·VI·KO·JA Contact
Solutions / NFFICE / Groupware / E-approval
[ NFFICE Groupware · E-approval ]

Every decision,approved and on record.

E-approval is how a company decides.

Requests reach the right approvers in the right order, under your rules, and every step is recorded. Responsibility is clear, and decisions move faster
— on desktop or phone.

A good approval system knows delegated, proxy and post-approval. It also knows the language of the people who use it. NFFICE is built for both: your company’s approval rules × your workplace’s languages.

Feature 1/ 12E-approval & delegation rules
Screen · sample data
Authority rules v3 · Hanoi entitySample data
DocumentAmount bandFinal approverType
Purchase request≤ 10,000,000₫Team leadSequential
Purchase request10–40M₫Entity director+ Finance consensus
Purchase request> 40,000,000₫HQ CFO+ Parallel
Expense claim≤ 5,000,000₫Team lead (delegated)Sequential
Urgent repair≤ 5,000,000₫Post-approval · 3 daysPost
This month · returned 4 · recalled 1 · redrafted 3
1234

Every type of approval, set as a rule.

Sequential and parallel approval, consensus, reference and receipt, delegated final approval, proxy and post-approval — set once from your authority regulations and applied to every form, in every entity.

  1. 1
    Six approval types

    Sequential, parallel, consensus, reference, receipt and post-approval set per form; a parallel step completes on all or on any one.

  2. 2
    Authority matrix

    Final approver set by document type × amount band × position. Each revision is versioned (v3, v4…) with a scheduled effective date.

  3. 3
    Proxy and post-approval

    Proxies are set by period and scope. Post-approval needs a reason and a deadline (e.g. 3 days), with reminders when it lapses.

  4. 4
    Return, recall, redraft

    A return needs a reason; recall works until the next approver opens the document; a redraft keeps earlier comments and versions.

At a glance
01Approval typesSequentialparallelconsensusreferencereceiptpost
02Authority basisDocument × amount × position
03Rule changesVersioned, scheduled
04ScopePer form and entity
Feature 2/ 12Multilingual approval
Screen · sample data
Đề nghị mua hàng · PR-2026-0398VI original ↔ EN
Mua thép D16 cho dự án Bắc Ninh↳ Rebar D16 for the Bac Ninh project
Nhà cung cấp: Lotus Build↳ Supplier: Lotus Build
Giao hàng trước 30/10/2026↳ Delivery before 30/10/2026
Kim Do-hyun · directorApproved — please prioritise early delivery.Đã duyệt — ưu tiên giao hàng sớm.
Glossary · thép D16 = rebar D16
1234

Each approver reads in their own language.

A Vietnamese employee drafts in Vietnamese, the Korean director approves in Korean, HQ reads in English.
Translation happens inside the document, and the original is stored with every translation — nothing gets lost between languages.

  1. 1
    Language per user

    Documents, comments and notifications appear in each user’s language — KO, VI and EN, with JA as an option.

  2. 2
    Original kept

    Original and translations live in one document, the original one click away. The original is the binding version.

  3. 3
    Comments translated

    Approval comments and return reasons are shown in the reader’s language, with the original alongside.

  4. 4
    Fixed company terms

    A company glossary fixes items, departments and titles; amounts, dates and codes are never translated.

At a glance
01LanguagesKOVIEN (+ JA)
02StoredOriginal + translations
03Binding versionThe original
04Translation quotaPer plan
Feature 3/ 12Form builder
Screen · sample data
Form builder · Purchase requestv4 · Hanoi
TextAmountDateAttachmentTable
TitleRebar D16 purchase
Items · 3 rowsTotal 1,240,000,000₫ · VAT 8%
SupplierLotus Build
Delivery2026-10-30
Attachmentquote.pdf
Rule · amount > 10,000,000₫ → add director
1234

Start from a form. Shape it without code.

Purchase, expense, leave, business-trip and seal-use forms are ready on day one.
Admins add fields, calculations and conditions by drag and drop, and each form carries its own approval rules and numbering — per entity if needed.

  1. 1
    Starter forms

    Purchase, expense, leave, trip and seal-use forms included, adjusted to your own layout.

  2. 2
    Fields and calculations

    Text, amount, date, attachment and table fields; table totals and VAT calculated; required fields checked before submit.

  3. 3
    Conditional rules

    Rules on field values — “amount > 10,000,000₫ adds the director” — are saved with the form.

  4. 4
    Versions and entities

    Edits create a new version while documents in progress keep theirs; each entity can run its own version.

At a glance
01Starter formsPurchaseexpenseleavetripseal
02FieldsTextamountdatefiletable
03CalculationsTotals and VAT
04VersionsPer entity, in-progress protected
Feature 4/ 12Automatic approval lines
Screen · sample data
New document · approval lineSample data
FormPurchase request
Amount45,000,000₫
DepartmentProduction
EntityHanoi
DraftTrần Văn Minh
Team leadNguyễn Thị LanHead of department
ConsensusPark Ji-wooOver budget
DirectorKim Do-hyun> 10M₫
HQ CFOChicago> 40M₫
🔒 Required by rules v3 · cannot be removed
1234

The right approvers, added automatically.

The approval line is built from the form, the amount, the department and the entity — using the org chart and the authority rules.
Nobody has to remember who signs what, and when someone changes teams, the lines follow.

  1. 1
    From the org chart

    Heads of team, division and entity are found by position and updated the moment an appointment changes.

  2. 2
    Amount bands

    Approvers are added by amount band — above 40,000,000₫, for example, HQ CFO.

  3. 3
    Consensus and reference

    Legal on contracts, finance when over budget, related teams as reference — added automatically.

  4. 4
    Edit limits

    Approvers required by the rules cannot be removed, only added to; every change is kept in the history.

At a glance
01Built fromFormamountdepartmententity
02Org chartAppointments apply at once
03Added automaticallyConsensusreference
04EditingAdd onlylogged
Feature 5/ 12Approval & document boxes
Screen · sample data
Approval box · Hanoi entitySample data
Waiting 7Drafted 12DoneDeptDelegated 2
⌕ Purchase request · Oct 2026 · ≥ 10,000,000₫
Purchase request · rebar D16Trần Văn Minh · Production
45,000,000₫D-1
Expense claim · October tripPark Ji-woo · Finance
2,310,000₫
Leave request · 2 daysNguyễn Thị Lan
28–29/10Delegated
Lease renewal · officeLê Thu Hà · Legal
—Mobile
1234

Every document, where you expect it.

Waiting, drafted, completed, department and delegated boxes sort themselves as documents move.
Search by form, period, drafter and amount, see what is due first — and find the same boxes in the mobile app.

  1. 1
    Boxes that sort themselves

    Waiting, drafted, completed, department, reference and delegated boxes, each with an unread count; a document moves box by itself as it is approved.

  2. 2
    Search by form, period and amount

    Filter by form, period, drafter, department, entity and amount range, then save the filter for next time; results export to Excel.

  3. 3
    Due dates first

    Documents near their due date are marked D-1 or overdue and float to the top; drafters can see who is holding a document and since when.

  4. 4
    Same boxes on the phone

    The mobile app shows the same boxes and counts; approve, return or add a comment from a push alert, with attachments in a viewer.

At a glance
01BoxesWaitingdrafteddonedeptdelegated
02SearchFormperiodamountdrafter
03PriorityD-1 and overdue first
04MobileSame boxes, push approval
Feature 6/ 12Delegation while away
Screen · sample data
Delegation · Kim Do-hyun, directorSample data
Away periodBusiness trip · Hanoi → Seoul
21–23/10
DeputyApproves within the scope below
Tran Thi Mai
ScopePurchase, expense · up to 40,000,000₫
2 forms
Notify meEvery proxy decision, at once
End on return24/10 00:00
Delegated box · 3 documents approved by proxy this trip
1234

Approvals keep moving when people travel.

Set a trip or leave period and a deputy approves within the scope you allow.
The document shows it was approved by proxy, the original approver is told about every decision, and the delegation ends on its own when you are back.

  1. 1
    Away period

    Set dates once, or let approved leave and trips set them automatically; the deputy takes over at 00:00 on the first day.

  2. 2
    Deputy and scope

    Choose a deputy and limit the scope — for example purchase and expense forms up to 40,000,000₫; anything above waits or goes to the next approver.

  3. 3
    Marked as proxy

    The approval line shows “approved by proxy: Tran Thi Mai for Kim Do-hyun”, and the deputy sees these documents in a separate delegated box.

  4. 4
    Notified, then released

    The original approver gets a notice for every proxy decision and can review them in one list; the delegation ends automatically on the return date.

At a glance
01PeriodDates, or from approved leave
02ScopeForms and amount limit
03RecordProxy marked on the line
04EndsAutomatically on return
Feature 7/ 12Tamper-proof numbering
Screen · sample data
Document history · PR-2026-0412Sample data
TimePersonActionStatus
14/10 09:02Trần Văn MinhDrafted · number issuedPR-2026-0412
09:40Nguyễn Thị LanApprovedTeam lead
11:15Park Ji-wooAgreed · 1 commentFinance
14:10HQ CFOFinal approvalLocked
15/10 08:30Kim Do-hyunPrinted · 1 copy
Edits after lock: 0 · fingerprint matches · 3 views, 1 print
1234

Once approved, it cannot change.

The moment the final approval lands, the document is locked and numbered by your rule.
Every approver and time is stamped on it, and every later view, print and export is added to its history — so the record holds up in an audit.

  1. 1
    Locked on approval

    After the final approval, the body, amounts and attachments are read-only; a content fingerprint is kept and checked whenever the document is opened.

  2. 2
    Numbering by your rule

    Numbers follow a pattern per entity and form — PR-2026-0412 — issued in order, never reused, and visible in search.

  3. 3
    Approvers and times stamped

    Each approver, decision and time is recorded on the document and printed on every page.

  4. 4
    Full history

    Views, prints, downloads and exports are logged after approval; changes need a new linked document, never an edit.

At a glance
01After approvalRead-only, fingerprinted
02NumberFORM-YEAR-#### per entity
03On every pageApprovers and times
04HistoryViews, prints, exports
Feature 8/ 12Print, PDF & seals
Screen · sample data
PDF preview · official layoutSample data
PR-2026-0412PDF · A4
Purchase request — rebar D16
SupplierLotus Build
Amount45,000,000₫
Delivery2026-10-30
Approved2026-10-14 14:10
DrafterTTrần Văn Minh09:02
Team leadNNguyễn Thị Lan09:40
FinancePPark Ji-woo11:15
Company sealKKim Do-hyun14:10
PR-2026-0412 · locked · page 1/1 · printed 15/10 08:30 by Kim Do-hyun
1234

Ready to print — signed and sealed.

Approved documents become PDFs in the official layout your partners and authorities expect, with each approver’s signature or seal in approval order, the company seal where it is required, and a footer that proves the document’s status.

  1. 1
    Signatures in order

    Each approver’s registered signature or personal seal is placed in the approval boxes, in the order they approved.

  2. 2
    Department and company seals

    Department seals and the company seal are applied only on forms that require them, after the seal holder’s approval — and every use is logged.

  3. 3
    Official layouts

    A4 layouts with your logo, entity details and Vietnamese, Korean or English headings — one per form, set by the admin.

  4. 4
    Proof in the footer

    The footer carries the document number, lock status, page count and who printed it when — so a copy can be traced back.

At a glance
01OutputPDFA4 official layout
02SignaturesIn approval order
03SealsDepartmentcompany, logged
04FooterNumberlockprinted by
Feature 9/ 12Inter-company documents
Screen · sample data
Inter-company document · contract reviewSample data
FromSample Co. Vina · Hanoi
ToLotus Build
DocumentContract review
Reply by24/10
SendKim Do-hyunSample Co. Vina
ReceiveLotus BuildReceiving box
ApproveLotus BuildOwn line
ReplyLotus BuildComments attached
RecordNFFICELinked · CR-2026-031
🔒 Original kept locked by the sender · only this document is shared
1234

Approvals that cross company lines.

Send approval documents between your own entities or to partner companies on NFFICE.
Each side approves in its own workspace, under its own rules, and the send, receipt and reply stay linked as one record.

  1. 1
    Send between companies

    Send to another entity or a partner’s receiving box; the receiver sees the document, its attachments and the sender’s approval record.

  2. 2
    Each side’s own line

    The receiver routes it through its own approval line and rules; neither side sees the other’s internal comments.

  3. 3
    One linked record

    Send, receipt, approval and reply are time-stamped and linked to one document number on both sides.

  4. 4
    Only what is shared

    Only the sent document and its attachments cross over; the original stays locked in the sender’s workspace.

At a glance
01BetweenOwn entitiespartner companies
02ApprovalEach side’s own line
03RecordSendreceivereply linked
04SharedThat document only
Feature 10/ 12External system integration
Screen · sample data
Integration · sent todaySample data
DocumentTargetMappedTimeStatus
PR-2026-0412ERP · purchase order12 fields · 2 files14:11Sent
EX-2026-0388Accounting9 fields14:30Retry 1/3
PY-2026-0102Bank payment file7 fields15:02Sent
BT-2026-0091HR · attendance5 fields15:20Queued
PR-2026-0415ERP · purchase order12 fields15:41Failed · alert
Today 128 sent · 3 retried · 1 failed and flagged
1234

Approved documents go where they are needed.

When a purchase, expense or payment is approved, its fields and attachments are sent to the system your company chooses — ERP, accounting or banking — with automatic retries and a status screen, so nobody re-types an approved document.

  1. 1
    Mapped fields and files

    Each form field is mapped once to the target system — supplier code, cost centre, amount, VAT — and attachments travel with it.

  2. 2
    Automatic retry

    Failed sends retry up to three times with growing intervals; after that the document is flagged and the admin is notified.

  3. 3
    Status screen

    Admins see every send with its target, time and result, and can resend after fixing the data.

  4. 4
    Your choice of system

    Connect by API or by file drop, per form and entity — ERP purchase orders, accounting entries, bank payment files.

At a glance
01TargetsERPaccountingbanking
02MethodAPI or file, per form
03On failure3 retries, then admin alert
04VisibilityStatus screen, resend
Feature 11/ 12Vietnam certified e-signature
Screen · sample data
E-signature · contract renewalSample data
127/2026/CV-HNSigned · certificate valid
Office lease renewal — Hanoi
SignerLee Jae-won · General Director
MethodUSB token
CertificateCertified CA · valid to 03/2027
BasisLaw on E-Transactions 20/2023
ApprovedKKim Do-hyun20/10 09:10
SignedLLee Jae-won20/10 10:02
CheckedNNFFICE20/10 10:02
Signed original stored with approval CT-2026-0127 · certificate check attached
1234

Signed with a certified digital signature.

Contracts and official letters are signed with a certified digital signature — a USB token at the desk, or a remote signature confirmed by OTP on the road.
The certificate is checked, and the signed original is kept with the approval that produced it.

  1. 1
    USB token or remote OTP

    Sign with a USB token plugged into the PC, or remotely with a one-time code sent to the signer’s phone.

  2. 2
    Certificate checked

    The certificate’s issuer, validity and revocation status are checked at signing and recorded with the document.

  3. 3
    Kept with its approval

    The signed original, its certificate check and the approval line are stored together and found by the same number.

  4. 4
    Under Vietnamese law

    Signing follows Vietnam’s Law on E-Transactions (20/2023/QH15); which documents may be signed electronically is confirmed with your legal team.

At a glance
01MethodsUSB tokenremote OTP
02VerificationIssuer, validity, revocation
03StoredWith the approval
04BasisLaw 20/2023/QH15
Feature 12/ 12AI drafting assistant
Screen · sample data
AI drafting assistantAI draft · check before submitting
Trần Văn Minh

50 racks for the Bac Ninh warehouse, under 300M₫, this month.

Assistant

I drafted a purchase request. Please check it before you submit.

↳ Budget left: 312,000,000₫ · HQ approval above 40M₫
AI draft · purchase requestWarehouse racking × 50
ItemRacking × 50
SiteBac Ninh warehouse
Budget285,000,000₫
Needed by2026-11-30
Review and submit
1234

A first draft, ready to check.

Describe what you need in a sentence and the assistant drafts the request on the right form, with the fields filled and the budget checked. Approvers get a short summary of long documents. People read, edit and submit — nothing is sent on its own.

  1. 1
    Draft from a sentence

    Write “50 racks for the Bac Ninh warehouse, under 300M₫, this month” and get a purchase request with item, site, budget and date filled in.

  2. 2
    Summary for approvers

    Each approver sees a three-line summary with the amount, the budget balance and the rule that applies — next to the full document.

  3. 3
    People decide

    Drafts are marked as AI drafts until a person edits and submits them; nothing is submitted, approved or sent automatically.

  4. 4
    Right form, right rules

    The draft uses your forms, glossary and authority rules, so the approval line is built exactly as for a hand-written request.

At a glance
01InputOne sentence, any of KOVIEN
02OutputDraft on your form
03Approvers getThree-line summary
04SubmissionOnly by a person
The difference

Before and after NFFICE

BeforeWith NFFICE E-approval
Paper waits on the director’s desk
Routed by rule, approved on the phone
Translations travel by email
Translated inside the document
Numbers and seals tracked by hand
Locked, numbered and stamped automatically
Approved costs retyped into accounting
Sent to accounting the moment it is approved
FAQ

Questions we hear often

Can we keep our HQ approval rules?

Yes. Delegated, proxy, post-approval and consensus steps are configured to match your regulations.

Who can see the translation?

Everyone on the approval line sees their own language; the original is always one click away.

Can we bring old approval documents?

Yes, with the document migration tool.

Is a certified e-signature available?

Yes. Contracts and official letters are signed with a certified digital signature — a USB token, or remote signing confirmed by OTP — under Decree 23/2025/ND-CP (VN). The signed original stays with its approval.

Can the approval line change after a document is submitted?

The line is fixed by the rule version in force when the document is submitted. An admin can add a reviewer with a reason, and the change is recorded on the document.

What happens when a document is returned?

It goes back to the drafter with the comment. The re-draft keeps the earlier version and comments, so approvers see exactly what changed.

Can we approve several documents at once?

Yes, on forms your admin allows — leave requests, for example. Documents above an amount threshold still have to be opened one by one.

Who can see a document?

The people on its approval line, its reference and receiving lists, and the department box — within each person’s permissions. HQ roles see documents across entities.

How are rule changes tracked?

Each change is saved as a new version with its effective date. Every document keeps the version it was routed by, so a past approval can always be explained.

Can we export approved documents for an audit?

Yes. Each document exports as a stamped PDF with its approval history, and lists export to Excel by period, form or entity.

See it on your own
approval forms.

A specialist replies within one business day — in English, Vietnamese, Japanese or Korean.

Book a consultationContact us
↑Back to top